Smaller domestic consumer unit with each circuit clearly labelled

Developer EICR work is more nuanced than landlord or homeowner work because the obvious question — “do I need an EICR on my new build?” — has a precise answer that’s often “no, you need an EIC”. CJA Electrical works with developers across Sittingbourne and the wider Swale area on the situations where an EICR is actually the right document: refurbishments of existing installations, change-of-use conversions where the wiring is being adapted rather than replaced, and periodic inspection of completed phases that have entered service.

What an EICR involves for Developer

Developer EICR scope is most often one of three things. Refurbishment of an existing installation: where the existing wiring is being kept and adapted rather than ripped out, an EICR confirms its current condition before the refurb goes live. Change-of-use conversion: a building being converted from commercial or single-dwelling to multiple dwellings, with the existing wiring carried forward in part. Phased completion handover: a development delivered in stages, where earlier phases have entered service and need periodic inspection. All three follow BS 7671:2018+A2:2022. C1, C2, C3, FI codes apply per the standard. New circuits added as part of the works get an EIC separately at the point they’re commissioned.

When you need this in Sittingbourne

Common developer scenarios for an EICR in Sittingbourne: - Acquisition due diligence on a property being purchased for refurbishment - Pre-refurb baseline EICR documenting the existing installation’s condition - Post-refurb EICR confirming the kept-and-adapted wiring is still satisfactory - Change-of-use conversion EICR — house to flats, commercial to residential, etc. - Periodic inspection on completed phases of a development already in service - EICR alongside an EIC on a project mixing new circuits and retained existing wiring

Multifunction tester measuring end-to-end resistance on a ring final circuit
Multifunction tester measuring end-to-end resistance on a ring final circuit

What the report contains

Standard three-part EICR deliverable: form, schedule of inspection, schedule of test results. For phased developments, we’ll commonly supply a plot-by-plot summary alongside the individual reports so the developer’s project tracker has a single overview document. Where new circuits sit alongside retained wiring, we’ll issue the appropriate EIC for the new work in addition to the EICR for the retained installation. Two documents, two purposes.

Why book CJA Electrical for your Sittingbourne EICR

What developers usually want from an EICR partner is precision and timing. Precision because the EIC vs EICR distinction matters and gets it wrong on BC sign-off. Timing because the inspection slot has to fit a wider project programme, often with multiple trades on site. City & Guilds 2391 qualified for the inspection and testing, ten years on Swale domestic projects, comfortable working alongside other trades on a live site. Same-week turnaround typical for Sittingbourne projects.

Main service fuse, cutout and smart meter on the incoming supply
Main service fuse, cutout and smart meter on the incoming supply

How the inspection runs

What it looks like on a typical Sittingbourne refurb: Site visit to scope the existing installation. Pre-refurb EICR if the developer wants the starting condition on file. Refurb proceeds. New circuits (where any are added) get an EIC at commissioning. Post-refurb EICR confirms the kept-and-adapted installation is still satisfactory. Final paperwork pack handed over with the project sign-off.

What affects the price

Pricing depends on the project shape. A single-dwelling refurb EICR is priced like any domestic EICR. Multi-plot phased developments are priced per plot, with bulk rates available across plots inspected on the same visit. EIC for new circuits is a separate line, priced by circuit count. Quote responses are usually same-day on receipt of the project scope.

FAQs

Do new builds in Sittingbourne need an EICR or an EIC?

New builds need an Electrical Installation Certificate (EIC), not an EICR. The EIC is issued by the installing electrician at the point the new installation is commissioned and forms part of the Building Control sign-off documentation. An EICR is a periodic inspection document that applies to existing installations after they’ve entered service — typically five years or more after the EIC was issued.

When during a refurb do I need an EICR vs an EIC?

Existing wiring being kept and adapted as part of a refurbishment is the EICR domain — the report documents the condition of what’s being retained. New circuits added during the refurbishment get their own EIC at the point they’re commissioned. A typical refurb often produces both documents — EICR for the retained installation, EIC for the new circuits.

What’s the difference between a Minor Works Certificate and an EICR?

A Minor Works Certificate (MWC) is issued for small additions to an existing installation that don’t constitute a new circuit — for example, adding an extra socket on an existing ring main. The MWC documents the modification and confirms it doesn’t compromise the installation’s safety. An EICR is a full periodic inspection of every accessible part of the installation; the two cover very different scopes.

Do you handle EIC issuance alongside EICR work on a project?

Yes. Most developer projects mix retained and new installation work. We’ll issue the EICR for the retained sections and EICs for the new circuits, with both documents formatted for Building Control sign-off and for the eventual buyer’s conveyancing. Single point of contact for both, single project invoice.

Can you work alongside other trades on a live site in Sittingbourne?

Yes. Most of our developer work happens on live sites with other trades present. We coordinate with the site manager or principal contractor to fit the inspection slot into the wider programme, and we work to the site’s H&S and access protocols. Sittingbourne sites are reached from our Rochester base in around 30 minutes.

Developer EICR in nearby towns

EICR for other audiences in Sittingbourne

Get a quote

Send a quick message and you'll get a same-day reply during working hours. Skip straight to phone or WhatsApp if you prefer.

EICR detail (helps with the quote)

Or skip the form: Call 07598 216512 WhatsApp info@cjaelectrical.co.uk