Main service fuse, cutout and smart meter on the incoming supply

Developer compliance for electrical work splits into two streams. New installations — circuits added during build, refurb, or conversion — produce an Electrical Installation Certificate (EIC) at commissioning. Existing installations being inspected periodically produce an EICR. We work with Faversham developers on both: EIC for new work signed off as it goes in, EICR on existing installations inherited through purchase or returned to service after refurb.

What an EICR involves for Developer

Developer EICR scope is most often one of three things. Refurbishment of an existing installation: where the existing wiring is being kept and adapted rather than ripped out, an EICR confirms its current condition before the refurb goes live. Change-of-use conversion: a building being converted from commercial or single-dwelling to multiple dwellings, with the existing wiring carried forward in part. Phased completion handover: a development delivered in stages, where earlier phases have entered service and need periodic inspection. All three follow BS 7671:2018+A2:2022. C1, C2, C3, FI codes apply per the standard. New circuits added as part of the works get an EIC separately at the point they’re commissioned.

When you need this in Faversham

Developers come to us for EICR work in a handful of recurring patterns: pre-purchase due diligence on properties being acquired for refurb; snagging-stage inspection where an existing installation has been kept and needs final sign-off; periodic inspection on the early phases of a multi-phase development that have entered service; and change-of-use work where an existing installation needs assessment before being adapted to new use. The trigger varies; the inspection itself is consistent.

Inside a fully wired domestic consumer unit
Inside a fully wired domestic consumer unit

What the report contains

Reports come back as the standard EICR PDF — form, schedule of inspection, schedule of test results, all in one document. For developer projects we can supply alongside a covering memo summarising the inspection scope, what was in EICR scope vs EIC scope, and any limitations encountered. Failed findings come with remedial quotes for the developer to incorporate into the project cost. Re-test on completion to issue a clean certificate.

Why book CJA Electrical for your Faversham EICR

For developer work, the value is in getting the documentation right. EIC where it should be an EIC, EICR where it should be an EICR, all formatted correctly for Building Control sign-off and for the eventual buyer’s solicitor. CJA Electrical works to BS 7671:2018+A2:2022 with a City & Guilds 2391 qualified inspector, fully insured, ten years on Swale projects. Reports back within 48 hours of testing; remedial quotes attached where needed.

Fully labelled domestic consumer unit after EICR testing
Fully labelled domestic consumer unit after EICR testing

How the inspection runs

The developer flow: Initial conversation about the project — what’s existing, what’s new, where on the programme the inspection sits. Quote and appointment options out the same day. Inspection coordinated with the site lead. Report PDF inside 48 hours. EIC for new circuits issued separately as work is commissioned. Remedial work, if needed, scoped and quoted to fit the wider build cost.

What affects the price

Developer EICR work is priced per inspection scope. Refurbishment baseline EICR on a single dwelling is priced like a domestic EICR. Phased-development work is priced per plot or per block depending on what’s being inspected. EIC work for new circuits is priced separately by circuit count. Get in touch with the project scope and we’ll come back with a fixed quote.

FAQs

When during a refurb do I need an EICR vs an EIC?

Existing wiring being kept and adapted as part of a refurbishment is the EICR domain — the report documents the condition of what’s being retained. New circuits added during the refurbishment get their own EIC at the point they’re commissioned. A typical refurb often produces both documents — EICR for the retained installation, EIC for the new circuits.

What’s the difference between a Minor Works Certificate and an EICR?

A Minor Works Certificate (MWC) is issued for small additions to an existing installation that don’t constitute a new circuit — for example, adding an extra socket on an existing ring main. The MWC documents the modification and confirms it doesn’t compromise the installation’s safety. An EICR is a full periodic inspection of every accessible part of the installation; the two cover very different scopes.

Do you handle EIC issuance alongside EICR work on a project?

Yes. Most developer projects mix retained and new installation work. We’ll issue the EICR for the retained sections and EICs for the new circuits, with both documents formatted for Building Control sign-off and for the eventual buyer’s conveyancing. Single point of contact for both, single project invoice.

Can you work alongside other trades on a live site in Faversham?

Yes. Most of our developer work happens on live sites with other trades present. We coordinate with the site manager or principal contractor to fit the inspection slot into the wider programme, and we work to the site’s H&S and access protocols. Faversham sites are reached from our Rochester base in around 35 minutes.

Do you supply documentation in a format Building Control accepts?

Yes. EICs and EICRs follow the standard BS 7671 formats that Building Control bodies accept across England. Standard three-part EICR PDF — form, schedule of inspection, schedule of test results — and standard EIC for new circuits with the matching schedule of test results.

How quickly can you turn EICR work round on a developer project?

Same-week appointments are typical for Faversham projects, with the report PDF in the project inbox within 48 hours of the visit. For phased developments where multiple plots need inspecting, we batch the visits to keep the cost down and the turnaround tight. Tighter timelines are possible where the project programme demands it.

Do I need an EICR on a property I’ve just bought to refurbish?

Not strictly required by law, but it’s standard due diligence. A pre-refurb EICR documents the condition of the existing installation before any work starts, which protects you if findings emerge later. Where the refurb plan involves keeping significant parts of the existing wiring, the EICR is also useful evidence that what’s being retained is still satisfactory.

Developer EICR in nearby towns

EICR for other audiences in Faversham

Get a quote

Send a quick message and you'll get a same-day reply during working hours. Skip straight to phone or WhatsApp if you prefer.

EICR detail (helps with the quote)

Or skip the form: Call 07598 216512 WhatsApp info@cjaelectrical.co.uk