Multifunction tester measuring end-to-end resistance on a ring final circuit

Developer compliance for electrical work splits into two streams. New installations — circuits added during build, refurb, or conversion — produce an Electrical Installation Certificate (EIC) at commissioning. Existing installations being inspected periodically produce an EICR. We work with Ashford developers on both: EIC for new work signed off as it goes in, EICR on existing installations inherited through purchase or returned to service after refurb.

What an EICR involves for Developer

The technical inspection runs to BS 7671:2018+A2:2022 — same standard as any other domestic EICR. What differs for developer work is the trigger and the handover. A refurbishment EICR captures the state of an existing installation at the start or end of the works, so the developer has clean evidence of what was inherited and what was kept. Where new circuits are added to an existing installation as part of the works, those new circuits also get an Electrical Installation Certificate (EIC) at commissioning — separate document, separate purpose.

When you need this in Ashford

Developers come to us for EICR work in a handful of recurring patterns: pre-purchase due diligence on properties being acquired for refurb; snagging-stage inspection where an existing installation has been kept and needs final sign-off; periodic inspection on the early phases of a multi-phase development that have entered service; and change-of-use work where an existing installation needs assessment before being adapted to new use. The trigger varies; the inspection itself is consistent.

Fully labelled domestic consumer unit after EICR testing
Fully labelled domestic consumer unit after EICR testing

What the report contains

Standard three-part EICR deliverable: form, schedule of inspection, schedule of test results. For phased developments, we’ll commonly supply a plot-by-plot summary alongside the individual reports so the developer’s project tracker has a single overview document. Where new circuits sit alongside retained wiring, we’ll issue the appropriate EIC for the new work in addition to the EICR for the retained installation. Two documents, two purposes.

Why book CJA Electrical for your Ashford EICR

What developers usually want from an EICR partner is precision and timing. Precision because the EIC vs EICR distinction matters and gets it wrong on BC sign-off. Timing because the inspection slot has to fit a wider project programme, often with multiple trades on site. City & Guilds 2391 qualified for the inspection and testing, ten years on Ashford domestic projects, comfortable working alongside other trades on a live site. Same-week turnaround typical for Ashford projects.

Smaller domestic consumer unit with each circuit clearly labelled
Smaller domestic consumer unit with each circuit clearly labelled

How the inspection runs

The developer flow: Initial conversation about the project — what’s existing, what’s new, where on the programme the inspection sits. Quote and appointment options out the same day. Inspection coordinated with the site lead. Report PDF inside 48 hours. EIC for new circuits issued separately as work is commissioned. Remedial work, if needed, scoped and quoted to fit the wider build cost.

What affects the price

Developer EICR work is priced per inspection scope. Refurbishment baseline EICR on a single dwelling is priced like a domestic EICR. Phased-development work is priced per plot or per block depending on what’s being inspected. EIC work for new circuits is priced separately by circuit count. Get in touch with the project scope and we’ll come back with a fixed quote.

FAQs

Do you handle EIC issuance alongside EICR work on a project?

Yes. Most developer projects mix retained and new installation work. We’ll issue the EICR for the retained sections and EICs for the new circuits, with both documents formatted for Building Control sign-off and for the eventual buyer’s conveyancing. Single point of contact for both, single project invoice.

Can you work alongside other trades on a live site in Ashford?

Yes. Most of our developer work happens on live sites with other trades present. We coordinate with the site manager or principal contractor to fit the inspection slot into the wider programme, and we work to the site’s H&S and access protocols. Ashford sites are reached from our Rochester base in around 50 minutes.

Do you supply documentation in a format Building Control accepts?

Yes. EICs and EICRs follow the standard BS 7671 formats that Building Control bodies accept across England. Standard three-part EICR PDF — form, schedule of inspection, schedule of test results — and standard EIC for new circuits with the matching schedule of test results.

How quickly can you turn EICR work round on a developer project?

Same-week appointments are typical for Ashford projects, with the report PDF in the project inbox within 48 hours of the visit. For phased developments where multiple plots need inspecting, we batch the visits to keep the cost down and the turnaround tight. Tighter timelines are possible where the project programme demands it.

Do I need an EICR on a property I’ve just bought to refurbish?

Not strictly required by law, but it’s standard due diligence. A pre-refurb EICR documents the condition of the existing installation before any work starts, which protects you if findings emerge later. Where the refurb plan involves keeping significant parts of the existing wiring, the EICR is also useful evidence that what’s being retained is still satisfactory.

What about Building Regulations notification on new circuits?

New circuits in dwellings are notifiable work under Building Regulations in England. We issue the appropriate Electrical Installation Certificate (EIC) at commissioning and the developer’s Building Control body takes the notification through standard channels. We don’t act as a self-certification scheme but the EIC documentation is what the BC body needs to sign off the work.

Developer EICR in nearby towns

EICR for other audiences in Ashford

Get a quote

Send a quick message and you'll get a same-day reply during working hours. Skip straight to phone or WhatsApp if you prefer.

EICR detail (helps with the quote)

Or skip the form: Call 07598 216512 WhatsApp info@cjaelectrical.co.uk