Office trunking and twin sockets in a commercial fit-out tested by CJA Electrical

For Medway business owners, building managers, and commercial landlords, the EICR is the piece of paper that closes the loop on the Electricity at Work Regulations 1989. CJA Electrical does the inspection, the test schedule, and (separately, if needed) the remedial work to clear observations. Most Strood commercial jobs are scheduled outside trading hours so the testing doesn’t disrupt the business.

What Commercial EICR actually is

A commercial EICR is a periodic inspection and test of the fixed wiring in a commercial premises — the distribution board, sub-circuits, sockets, lighting, and fixed equipment connections. It’s the same fundamental process as a domestic EICR, but typically covers larger installations, three-phase supplies, and the kind of building services (emergency lighting interface, fire alarm interface, plant equipment) that don’t appear in residential. The output is a written report against BS 7671 with observation codes (C1, C2, C3, FI) on anything that doesn’t meet the regulations, plus a schedule of test results documenting what was actually measured. The duty-holder uses the report to plan remedial work and demonstrate compliance.

When you need Commercial EICR in Strood

The standard inspection cycle for commercial premises follows IET Guidance Note 3. For most Strood offices, retail units, and small workshops that’s five years. Industrial premises, educational buildings, and laboratories typically run on a three-year cycle. Higher-risk environments — cinemas, theatres, swimming pools, petrol stations, places of public assembly — sit on annual inspection. Beyond the periodic cycle, an EICR is commissioned at change of occupancy (new tenant taking over a unit), after major refurbishment, after a known fault or insurance claim, and on insurance request at policy renewal. We’ve also done a few in Strood where a sale is in progress and the buyer’s surveyor has flagged the electrics for further investigation.

RCD and loop impedance testing in progress on a domestic circuit
RCD and loop impedance testing in progress on a domestic circuit

Standards and what compliance looks like

Fixed wire testing is governed by BS 7671 — the IET Wiring Regulations — which sets the technical requirements for what gets tested and to what tolerances. The legal duty to actually do the testing comes from the Electricity at Work Regulations 1989, specifically Regulation 4(2) (maintenance of electrical systems to prevent danger) and Regulation 16 (employer’s duty to ensure competent persons do the work). The inspection criteria, frequency guidance, and the format of the written report all follow IET Guidance Note 3. Medway Council and the HSE both reference Guidance Note 3 in their compliance expectations for commercial premises.

Testing schedule and remedials

The standard test sequence is documented in BS 7671 Part 6 — inspection first, then dead tests, then live tests. We work circuit-by-circuit, isolating each in turn so the rest of the building stays live, which is what makes phased testing during business hours feasible on most Strood commercial premises. Once testing is done the report is drafted, including the schedule of test results, the schedule of inspections, and the list of observations. The duty-holder typically gets the certificate as a PDF within 48 hours of testing — quicker if there’s a deadline against an insurance renewal or a tenant move-in.

Fully labelled domestic consumer unit after EICR testing
Fully labelled domestic consumer unit after EICR testing

Why Strood property owners book CJA Electrical

Most of the commercial EICR work in Strood comes from existing relationships — letting agents we’ve done landlord EICRs for who also manage commercial property, building owners we’ve upgraded consumer units for, businesses where we’ve done a domestic EICR on the director’s home and they’ve asked us to do the office at the same time. Word-of-mouth in a town this size builds the business steadily and means the work is done by someone with a reputation to protect. Operationally, the things that matter on commercial — phased testing during trading, reports in the format insurers and managing agents expect, separate quoting for remedials — are all covered as standard.

How the work runs

The process from first call to delivered certificate is straightforward. Initial chat (phone or email) to confirm the premises type, circuit count, board count, and access constraints. A quote — fixed price where possible, otherwise capped — covering the testing itself. A scheduled testing visit, typically out-of-hours for retail and during business hours for office. Report supplied as a PDF within 48 hours of testing completing, formatted to BS 7671 with all observations coded. If anything is unsatisfactory, remedial work gets quoted separately so you can decide which observations to clear first. Once the remedials are done, the affected circuits are re-tested and a fresh certificate issued reflecting the post-remedial state of the installation.

What affects the price

The two factors that drive Strood commercial EICR pricing are circuit count (more circuits = more testing time) and access (does the building need shutting down, can it be tested in phases, are there specialist areas like server rooms or plant rooms that need careful handling). Out-of-hours testing carries a small premium reflecting the late-evening or weekend working. Premises with single distribution boards and good access — most small offices and retail units — are quoted as a fixed price. Larger premises with multiple boards or specialist equipment get a capped quote based on a brief pre-visit scope.

FAQs

What law requires a commercial EICR?

The Electricity at Work Regulations 1989. Regulation 4(2) makes the duty-holder responsible for keeping the installation safe and maintained, and Regulation 16 makes the employer responsible for ensuring competent persons do the testing. The EICR is the standard documentary evidence of compliance with both. Insurers commonly require it as a condition of policy.

Can testing be done out of hours so we don’t shut the business?

Yes. Out-of-hours testing is the default for retail units, restaurants, and most Strood commercial premises. We can also phase the testing across multiple visits if the building can’t sustain a single block. Tell us when you’re closed (or quietest) and we’ll plan the work to fit.

What’s a sampling EICR and is it appropriate for our building?

Sampling is when the duty-holder specifies a percentage (often 10–20%) of circuits and accessories to be tested rather than 100%. The remaining circuits are visually inspected only. The sample is documented on the report and the duty-holder accepts responsibility for the un-tested portion. Appropriate for large, low-risk premises on tight inspection cycles. For most Strood commercial, full testing is the right call.

Who’s legally responsible — landlord or tenant?

Depends on the lease. In a typical full-repairing-and-insuring (FRI) commercial lease the tenant carries the duty for the installation within the demise. In shorter leases the landlord usually retains the duty. For multi-tenanted buildings, the landlord normally holds the duty for shared common parts and main supply. We can read the lease with you on a quick call and clarify who needs to commission the EICR.

How long does a commercial EICR take?

Half a day for a small Strood office (single board, ~20 circuits) up to two or three days for a multi-board industrial unit. Premises that need phased testing across weekends will take longer in calendar time but the same total testing hours. We give a realistic estimate at quoting stage based on the circuit count and access conditions.

What happens if the report comes back unsatisfactory?

Unsatisfactory just means the inspection has flagged C1 or C2 observations — items that need putting right to bring the installation back to compliance. The report lists each item, and CJA Electrical can quote separately for the remedial work. Once the remedials are done, the affected circuits are re-tested and a fresh, satisfactory certificate is issued.

Related services in Strood

Commercial EICR in nearby towns

Frequently asked questions

What law requires a commercial EICR?

The Electricity at Work Regulations 1989. Regulation 4(2) makes the duty-holder responsible for keeping the installation safe and maintained, and Regulation 16 makes the employer responsible for ensuring competent persons do the testing. The EICR is the standard documentary evidence of compliance with both. Insurers commonly require it as a condition of policy.

Can testing be done out of hours so we don't shut the business?

Yes. Out-of-hours testing is the default for retail units, restaurants, and most Strood commercial premises. We can also phase the testing across multiple visits if the building can't sustain a single block. Tell us when you're closed (or quietest) and we'll plan the work to fit.

What's a sampling EICR and is it appropriate for our building?

Sampling is when the duty-holder specifies a percentage (often 10–20%) of circuits and accessories to be tested rather than 100%. The remaining circuits are visually inspected only. The sample is documented on the report and the duty-holder accepts responsibility for the un-tested portion. Appropriate for large, low-risk premises on tight inspection cycles. For most Strood commercial, full testing is the right call.

Who's legally responsible — landlord or tenant?

Depends on the lease. In a typical full-repairing-and-insuring (FRI) commercial lease the tenant carries the duty for the installation within the demise. In shorter leases the landlord usually retains the duty. For multi-tenanted buildings, the landlord normally holds the duty for shared common parts and main supply. We can read the lease with you on a quick call and clarify who needs to commission the EICR.

How long does a commercial EICR take?

Half a day for a small Strood office (single board, ~20 circuits) up to two or three days for a multi-board industrial unit. Premises that need phased testing across weekends will take longer in calendar time but the same total testing hours. We give a realistic estimate at quoting stage based on the circuit count and access conditions.

What happens if the report comes back unsatisfactory?

Unsatisfactory just means the inspection has flagged C1 or C2 observations — items that need putting right to bring the installation back to compliance. The report lists each item, and CJA Electrical can quote separately for the remedial work. Once the remedials are done, the affected circuits are re-tested and a fresh, satisfactory certificate is issued.

Get a quote

Send a quick message and you'll get a same-day reply during working hours. Skip straight to phone or WhatsApp if you prefer.

EICR detail (helps with the quote)

Or skip the form: Call 07598 216512 WhatsApp info@cjaelectrical.co.uk