Labelled consumer unit in a rented property after a landlord EICR

For Medway landlords, the Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020 made the 5-yearly EICR legally non-negotiable. Every privately rented home in England needs a satisfactory report at least every five years, plus a fresh one at the start of any new tenancy. CJA Electrical does the inspection, the report, and (separately) any remedial work to clear an unsatisfactory report.

What Landlord EICR actually is

For rental property, the EICR is both a safety inspection and a compliance document. The safety side is what gets tested — the same inspection-and-test process as any EICR. The compliance side is what landlords actually need: documentary evidence, in a format Medway Council accepts, that the installation meets BS 7671 at the date of inspection. The 2020 PRS regulations require a satisfactory report (no C1 or C2 observations) every five years and at the start of each new tenancy. Reports referencing C3 observations alone still pass. Unsatisfactory reports (C1 or C2 present) trigger a 28-day deadline for remedial work to be completed and a fresh certificate to be issued.

When you need Landlord EICR in Rochester

The legal cycle: every 5 years, plus the start of any new tenancy. The practical cycle: book a couple of months early so any remedials don’t bring you up against the deadline. Medway Council can serve a remedial notice requiring work within a fixed timescale if a property is found non-compliant during enforcement; civil penalties up to £30,000 apply for landlords who ignore the notice. For new-build or fully recircuited property, the first 5-yearly EICR is due 5 years after the original Electrical Installation Certificate (EIC) was issued — not 5 years after the property was let. That distinction occasionally catches landlords out on properties that were rented mid-way through the original install warranty.

Inside a fully wired domestic consumer unit
Inside a fully wired domestic consumer unit

Standards and what compliance looks like

Two regulatory references apply: BS 7671:2018+A2:2022 (the technical standard the inspection works to) and the Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020 (the law requiring the inspection in the first place). BS 7671 sets out what gets tested, what passes, what fails, and how observations are coded. The 2020 PRS regulations set the cycle, the documentation requirements, and the consequences for non-compliance. Reports formatted to BS 7671 Appendix 6 are accepted by Medway Council and across the private rented sector industry.

Testing schedule and remedials

What gets tested on a landlord EICR: every circuit running off the consumer unit (lighting, sockets, immersion, cooker, shower, boiler), every accessible accessory (sockets, switches, light fittings, fan isolators), the consumer unit itself (visual inspection of devices and connections), and the main earthing and bonding at the intake. Common findings on Rochester rental property: ageing consumer units missing RCD protection on lighting circuits; loose backbox screws on tenant-occupied properties (where wear and tear has shifted faceplates); unprotected cable runs in lofts where tenants have been into the loft for storage; cracked switch plates from impact damage. Most are C2 or C3 — fixable, not catastrophic.

RCD and loop impedance testing in progress on a domestic circuit
RCD and loop impedance testing in progress on a domestic circuit

Why Rochester property owners book CJA Electrical

CJA Electrical works with private landlords and letting agents across Medway. Rochester sits within the 0 -minute working radius of our Rochester base, so scheduling around tenant availability is straightforward and re-tests after remedial work happen quickly. What landlords and agents tell us matters: same-week appointments, certificates inside 48 hours, reports formatted to satisfy Medway Council requests, and remedial work quoted clearly so the budget decision is straightforward. Same person on site, same person signing the certificate, no subcontracting.

How the work runs

Step one — the booking. We need property details (address, bedrooms, rough age of installation, any known issues) and the contact for tenant access (agent or tenant direct). Quote confirmed on that call for standard property; site visit first for unusual installations or HMO conversions. Step two — the testing visit. Half a day for most Rochester three-bed rental property; longer for HMOs and larger conversions. Brief power-downs during dead testing flagged in advance to the tenant. Property left exactly as found. Step three — the report. PDF inside 48 hours, supplied to landlord and agent. Remedials, if needed, quoted separately. Re-test scheduled once remedials are complete.

What affects the price

The two factors that move Rochester landlord EICR pricing are circuit count (more circuits = more testing time) and access (single visit with full tenant cooperation versus multiple return visits). For straightforward domestic rental property with cooperative tenant access, the price is well-established and quoted up-front. What we don’t do: deposits, hidden charges, or fees beyond the quoted price. The fixed price is what’s invoiced on completion. Remedials are separate so the EICR price is the EICR price.

FAQs

Do I have to do an EICR every 5 years on a rental?

Yes. Since June 2020, every privately rented home in England must have a satisfactory EICR every 5 years and at the start of each new tenancy. The certificate must be supplied to tenants within 28 days of the inspection and to Medway Council on request within 7 days.

What happens if I don’t have a current EICR?

Medway Council can serve a remedial notice requiring you to bring the installation into compliance within a fixed timescale, and can issue civil penalties of up to £30,000 for non-compliance. Insurers may also refuse to honour claims related to electrical incidents on properties without current certification.

How is tenant access arranged?

Either through your letting agent or directly with the tenant — whichever is easier for you. We coordinate the visit a few days in advance, confirm the appointment with the tenant, and work around their schedule for the testing visit itself. Most testing visits take a single morning or afternoon.

Can the certificate be sent direct to my agent?

Yes. The PDF can go to you, your letting agent, your council, or all of the above. Medway Council accepts the standard BS 7671 Appendix 6 format, as do all the major letting agents and managing agents we’ve worked with.

What if the report is unsatisfactory?

An unsatisfactory report just means there are C1 or C2 observations that need clearing before the property is compliant. CJA Electrical can quote separately for the remedial work, and once it’s done a re-test confirms the installation is satisfactory. A fresh certificate is issued documenting the post-remedial state.

Do I need a fresh EICR every time I get a new tenant?

Not necessarily. The 2020 regulations say a satisfactory EICR must be in place at the start of any new tenancy. If the existing certificate is current (less than 5 years old) and the property hasn’t been altered since, that certificate is valid for the new tenancy too. A fresh EICR is only legally required if the existing one is expired, missing, or unsatisfactory.

Related services in Rochester

Landlord EICR in nearby towns

Frequently asked questions

Do I have to do an EICR every 5 years on a rental?

Yes. Since June 2020, every privately rented home in England must have a satisfactory EICR every 5 years and at the start of each new tenancy. The certificate must be supplied to tenants within 28 days of the inspection and to Medway Council on request within 7 days.

What happens if I don't have a current EICR?

Medway Council can serve a remedial notice requiring you to bring the installation into compliance within a fixed timescale, and can issue civil penalties of up to £30,000 for non-compliance. Insurers may also refuse to honour claims related to electrical incidents on properties without current certification.

How is tenant access arranged?

Either through your letting agent or directly with the tenant — whichever is easier for you. We coordinate the visit a few days in advance, confirm the appointment with the tenant, and work around their schedule for the testing visit itself. Most testing visits take a single morning or afternoon.

Can the certificate be sent direct to my agent?

Yes. The PDF can go to you, your letting agent, your council, or all of the above. Medway Council accepts the standard BS 7671 Appendix 6 format, as do all the major letting agents and managing agents we've worked with.

What if the report is unsatisfactory?

An unsatisfactory report just means there are C1 or C2 observations that need clearing before the property is compliant. CJA Electrical can quote separately for the remedial work, and once it's done a re-test confirms the installation is satisfactory. A fresh certificate is issued documenting the post-remedial state.

Do I need a fresh EICR every time I get a new tenant?

Not necessarily. The 2020 regulations say a satisfactory EICR must be in place at the start of any new tenancy. If the existing certificate is current (less than 5 years old) and the property hasn't been altered since, that certificate is valid for the new tenancy too. A fresh EICR is only legally required if the existing one is expired, missing, or unsatisfactory.

Get a quote

Send a quick message and you'll get a same-day reply during working hours. Skip straight to phone or WhatsApp if you prefer.

EICR detail (helps with the quote)

Or skip the form: Call 07598 216512 WhatsApp info@cjaelectrical.co.uk