Smaller domestic consumer unit with each circuit clearly labelled

For developers active in Northfleet, the distinction between an EIC and an EICR matters. New circuits — whether on a greenfield site or in a refurbishment — get an Electrical Installation Certificate at the point they’re commissioned. An EICR comes in later, on existing installations, as periodic inspection evidence. Knowing which document applies at which stage of a development is half the compliance work; CJA Electrical handles both sides.

What an EICR involves for Developer

Developer EICR scope is most often one of three things. Refurbishment of an existing installation: where the existing wiring is being kept and adapted rather than ripped out, an EICR confirms its current condition before the refurb goes live. Change-of-use conversion: a building being converted from commercial or single-dwelling to multiple dwellings, with the existing wiring carried forward in part. Phased completion handover: a development delivered in stages, where earlier phases have entered service and need periodic inspection. All three follow BS 7671:2018+A2:2022. C1, C2, C3, FI codes apply per the standard. New circuits added as part of the works get an EIC separately at the point they’re commissioned.

When you need this in Northfleet

The triggers for a developer EICR aren’t the same as for a landlord EICR. Most often: an acquisition where the existing electrics need due-diligence inspection before completion; a refurbishment where the existing wiring is being kept in part and the developer needs evidence of its condition; or a phased development where some plots are already lived in and periodic inspection is due on the older phases. None of these scenarios fit the standard “rented property, every five years” template — they’re project-specific.

Inside a fully wired domestic consumer unit
Inside a fully wired domestic consumer unit

What the report contains

Standard three-part EICR deliverable: form, schedule of inspection, schedule of test results. For phased developments, we’ll commonly supply a plot-by-plot summary alongside the individual reports so the developer’s project tracker has a single overview document. Where new circuits sit alongside retained wiring, we’ll issue the appropriate EIC for the new work in addition to the EICR for the retained installation. Two documents, two purposes.

Why book CJA Electrical for your Northfleet EICR

For developer work, the value is in getting the documentation right. EIC where it should be an EIC, EICR where it should be an EICR, all formatted correctly for Building Control sign-off and for the eventual buyer’s solicitor. CJA Electrical works to BS 7671:2018+A2:2022 with a City & Guilds 2391 qualified inspector, fully insured, ten years on Gravesham projects. Reports back within 48 hours of testing; remedial quotes attached where needed.

Modern RCBO consumer unit after a satisfactory EICR
Modern RCBO consumer unit after a satisfactory EICR

How the inspection runs

What it looks like on a typical Northfleet refurb: Site visit to scope the existing installation. Pre-refurb EICR if the developer wants the starting condition on file. Refurb proceeds. New circuits (where any are added) get an EIC at commissioning. Post-refurb EICR confirms the kept-and-adapted installation is still satisfactory. Final paperwork pack handed over with the project sign-off.

What affects the price

No standard rate card for developer work — the variability between projects is too high. We’ll quote on receipt of the scope (number of dwellings, refurb vs new vs mixed, programme dates, access constraints) and the price is fixed at that point.

FAQs

What’s the difference between a Minor Works Certificate and an EICR?

A Minor Works Certificate (MWC) is issued for small additions to an existing installation that don’t constitute a new circuit — for example, adding an extra socket on an existing ring main. The MWC documents the modification and confirms it doesn’t compromise the installation’s safety. An EICR is a full periodic inspection of every accessible part of the installation; the two cover very different scopes.

Do you handle EIC issuance alongside EICR work on a project?

Yes. Most developer projects mix retained and new installation work. We’ll issue the EICR for the retained sections and EICs for the new circuits, with both documents formatted for Building Control sign-off and for the eventual buyer’s conveyancing. Single point of contact for both, single project invoice.

Can you work alongside other trades on a live site in Northfleet?

Yes. Most of our developer work happens on live sites with other trades present. We coordinate with the site manager or principal contractor to fit the inspection slot into the wider programme, and we work to the site’s H&S and access protocols. Northfleet sites are reached from our Rochester base in around 28 minutes.

Do you supply documentation in a format Building Control accepts?

Yes. EICs and EICRs follow the standard BS 7671 formats that Building Control bodies accept across England. Standard three-part EICR PDF — form, schedule of inspection, schedule of test results — and standard EIC for new circuits with the matching schedule of test results.

How quickly can you turn EICR work round on a developer project?

Same-week appointments are typical for Northfleet projects, with the report PDF in the project inbox within 48 hours of the visit. For phased developments where multiple plots need inspecting, we batch the visits to keep the cost down and the turnaround tight. Tighter timelines are possible where the project programme demands it.

Do I need an EICR on a property I’ve just bought to refurbish?

Not strictly required by law, but it’s standard due diligence. A pre-refurb EICR documents the condition of the existing installation before any work starts, which protects you if findings emerge later. Where the refurb plan involves keeping significant parts of the existing wiring, the EICR is also useful evidence that what’s being retained is still satisfactory.

Developer EICR in nearby towns

EICR for other audiences in Northfleet

Get a quote

Send a quick message and you'll get a same-day reply during working hours. Skip straight to phone or WhatsApp if you prefer.

EICR detail (helps with the quote)

Or skip the form: Call 07598 216512 WhatsApp info@cjaelectrical.co.uk