CJA Electrical does commercial EICR and fixed wire testing across Gravesend and the wider Gravesham area. The legal framework for commercial premises is the Electricity at Work Regulations 1989 — and the EICR (also called fixed wire testing or periodic inspection) is the standard documentary evidence that the duty-holder is meeting that obligation. Whether you’re an office tenant, a retail unit operator, or a building owner with multi-tenanted commercial property, the inspection runs out of our Rochester base.

What Commercial EICR actually is

Fixed wire testing — to use the term most commercial clients in Gravesend are familiar with — is a periodic inspection and test of every circuit in the building’s fixed installation. The inspection has two parts: a visual survey of the consumer unit, distribution boards, and accessible accessories, then dead and live electrical testing on each circuit (continuity, insulation resistance, polarity, earth fault loop, RCD operation). What lands on the report is a formal opinion of whether the installation is satisfactory or unsatisfactory against BS 7671, with each observation coded so the duty-holder knows what’s urgent and what isn’t. C1 means immediate danger, C2 potentially dangerous, C3 improvement recommended, FI further investigation required.

When you need Commercial EICR in Gravesend

There’s no single statutory cycle for commercial EICRs the way there is for domestic landlord property — the duty-holder works to IET Guidance Note 3 and to whatever the insurer’s policy schedule requires. Most policy schedules across Gravesham reference five-year intervals as standard, with shorter cycles where the building has higher inherent risk. What we see most often in Gravesend is the renewal trigger — the insurer asks for a current certificate at the policy anniversary, the building’s last EICR is more than five years old, and we get called in to bring it back into date. Other common triggers: a new tenant on the lease, a CDM-flagged fit-out completion, a refurbished consumer unit that needs documenting against the new circuits.

Smaller domestic consumer unit with each circuit clearly labelled
Smaller domestic consumer unit with each circuit clearly labelled

Standards and what compliance looks like

BS 7671 is the technical standard for the work itself — what “satisfactory” looks like, what gets tested, the tolerances on each test, the format of the report. The Electricity at Work Regulations 1989 is the law that says the duty-holder must keep the installation safe and provides the framework for prosecution if they don’t. Together they’re the framework Gravesend duty-holders work within. The current edition of BS 7671 is the 18th Edition with Amendment 2 (2022); any EICR signed off after January 2023 should reference that. Reports referring to older editions of BS 7671 are still technically valid for the cycle they were issued in but should be re-tested to current standards on the next inspection.

Testing schedule and remedials

Each circuit is tested in turn. Dead testing — with the circuit isolated — covers continuity of protective and bonding conductors, insulation resistance, polarity, and (for ring finals) ring continuity. Live testing — with the supply restored — covers earth fault loop impedance, prospective fault current, and RCD operating times. Every measurement is recorded on a schedule of test results and lodged with the certificate. Findings are recorded against observation codes (C1, C2, C3, FI) with a note against each. The summary on the front of the certificate gives an overall verdict — satisfactory or unsatisfactory — based on whether any C1 or C2 observations are present. C3 observations alone don’t make a report unsatisfactory; they’re recommendations rather than failures.

Inside a fully wired domestic consumer unit
Inside a fully wired domestic consumer unit

Why Gravesend property owners book CJA Electrical

Most of the commercial EICR work in Gravesend comes from existing relationships — letting agents we’ve done landlord EICRs for who also manage commercial property, building owners we’ve upgraded consumer units for, businesses where we’ve done a domestic EICR on the director’s home and they’ve asked us to do the office at the same time. Word-of-mouth in a town this size builds the business steadily and means the work is done by someone with a reputation to protect. Operationally, the things that matter on commercial — phased testing during trading, reports in the format insurers and managing agents expect, separate quoting for remedials — are all covered as standard.

How the work runs

First contact: a five-minute call to scope the premises. We need to know roughly what the installation looks like — number of distribution boards, three-phase or single-phase, number of circuits, whether there’s any specialist equipment (server rooms, plant, kitchens) that needs handling carefully. Most quotes go out within 24 hours of the initial call. Booking: testing scheduled around your hours. Most Gravesend offices are tested outside business hours; retail units are usually done early morning or evenings; workshops and industrial premises are sometimes done in phased blocks weekend-by-weekend if the building can’t shut down at all. Reporting: PDF within 48 hours, formatted to BS 7671 Appendix 6, with the schedule of test results, schedule of inspections, and observations all in the standard format insurers and managing agents expect to see.

What affects the price

Pricing is transparent: a fixed price for the inspection and report, separate quoting for any remedial work. The fixed price is set after a quick scoping conversation about the installation — circuit count, board count, three-phase or single-phase, any specialist equipment to handle. What the price includes: the on-site inspection, dead and live testing, schedule of test results, BS 7671-formatted report, PDF delivery within 48 hours. What’s separate: remedial work (quoted line-by-line against the report observations), any re-testing needed after remedials are completed, and any additional reports if the duty-holder wants the original split into board-specific certificates.

FAQs

What documentation do I get at the end?

The Electrical Installation Condition Report itself (front page with verdict, schedule of inspections, schedule of test results, list of observations) as a single PDF. We can split it into board-specific certificates if you need separate documents for individual tenants in a multi-tenanted building. The PDF is what your insurer, Gravesham Borough Council, and any future buyer’s surveyor will expect to see.

How often does a commercial EICR need doing?

IET Guidance Note 3 is the reference. Five years is standard for offices, retail, and most small commercial in Gravesend. Three years for industrial, educational, and most workshop premises. One year for higher-risk environments — cinemas, swimming pools, places of public assembly. The duty-holder can shorten these intervals based on risk assessment, and most insurers require evidence the building is on cycle.

What law requires a commercial EICR?

The Electricity at Work Regulations 1989. Regulation 4(2) makes the duty-holder responsible for keeping the installation safe and maintained, and Regulation 16 makes the employer responsible for ensuring competent persons do the testing. The EICR is the standard documentary evidence of compliance with both. Insurers commonly require it as a condition of policy.

Can testing be done out of hours so we don’t shut the business?

Yes. Out-of-hours testing is the default for retail units, restaurants, and most Gravesend commercial premises. We can also phase the testing across multiple visits if the building can’t sustain a single block. Tell us when you’re closed (or quietest) and we’ll plan the work to fit.

What’s a sampling EICR and is it appropriate for our building?

Sampling is when the duty-holder specifies a percentage (often 10–20%) of circuits and accessories to be tested rather than 100%. The remaining circuits are visually inspected only. The sample is documented on the report and the duty-holder accepts responsibility for the un-tested portion. Appropriate for large, low-risk premises on tight inspection cycles. For most Gravesend commercial, full testing is the right call.

Related services in Gravesend

Commercial EICR in nearby towns

Frequently asked questions

What documentation do I get at the end?

The Electrical Installation Condition Report itself (front page with verdict, schedule of inspections, schedule of test results, list of observations) as a single PDF. We can split it into board-specific certificates if you need separate documents for individual tenants in a multi-tenanted building. The PDF is what your insurer, Gravesham Borough Council, and any future buyer's surveyor will expect to see.

How often does a commercial EICR need doing?

IET Guidance Note 3 is the reference. Five years is standard for offices, retail, and most small commercial in Gravesend. Three years for industrial, educational, and most workshop premises. One year for higher-risk environments — cinemas, swimming pools, places of public assembly. The duty-holder can shorten these intervals based on risk assessment, and most insurers require evidence the building is on cycle.

What law requires a commercial EICR?

The Electricity at Work Regulations 1989. Regulation 4(2) makes the duty-holder responsible for keeping the installation safe and maintained, and Regulation 16 makes the employer responsible for ensuring competent persons do the testing. The EICR is the standard documentary evidence of compliance with both. Insurers commonly require it as a condition of policy.

Can testing be done out of hours so we don't shut the business?

Yes. Out-of-hours testing is the default for retail units, restaurants, and most Gravesend commercial premises. We can also phase the testing across multiple visits if the building can't sustain a single block. Tell us when you're closed (or quietest) and we'll plan the work to fit.

What's a sampling EICR and is it appropriate for our building?

Sampling is when the duty-holder specifies a percentage (often 10–20%) of circuits and accessories to be tested rather than 100%. The remaining circuits are visually inspected only. The sample is documented on the report and the duty-holder accepts responsibility for the un-tested portion. Appropriate for large, low-risk premises on tight inspection cycles. For most Gravesend commercial, full testing is the right call.

Get a quote

Send a quick message and you'll get a same-day reply during working hours. Skip straight to phone or WhatsApp if you prefer.

EICR detail (helps with the quote)

Or skip the form: Call 07598 216512 WhatsApp info@cjaelectrical.co.uk