EICR in Gravesend
EICR testing in Gravesend, with same-week appointments across Gravesham.
Periodic inspection and testing in Gravesend — what most people just call an EICR. The work covers a visual inspection of the consumer unit and accessible accessories, dead and live testing on every circuit, and a written report with each observation coded against BS 7671. Common drivers in Gravesham: a 5-yearly landlord check, a pre-sale or pre-purchase EICR, an insurer asking for current documentation, or a homeowner whose installation hasn’t been tested in a decade.
What EICR actually is
An EICR is a formal inspection and test of the fixed wiring in a property — the consumer unit, every circuit running off it, every accessible socket, switch, and light fitting. The output is a written report with observation codes against anything that’s not satisfactory: C1 for immediate danger, C2 for potentially dangerous (also a fail), C3 for improvement recommended, FI for further investigation required. A satisfactory report has no C1 or C2 observations. A property with C3 observations alone still passes. The report is what landlords need for the PRS regulations, what surveyors check on sale, and what insurers reference when validating a claim.
When you need EICR in Gravesend
Different reasons for different property types. Rented property in Gravesend runs on the 2020 PRS regulations — five years between inspections, plus a fresh report at the start of each new tenancy. The certificate is supplied to tenants and to the local authority on request. Owner-occupied property doesn’t have a statutory cycle. IET guidance is 10 years for domestic, but plenty of homeowners inspect more frequently — usually around major life events like buying, selling, or renovating. Insurance renewals also trigger it, especially on older properties or where there’s been a previous claim.

Standards and what compliance looks like
BS 7671:2018+A2:2022 is the technical reference behind every EICR. The standard sets out what gets inspected, what gets tested, what tolerances apply to each measurement, and how observations are coded. The 2022 amendment introduced changes around surge protection (now required on most domestic installations), arc fault detection in some circumstances, and updated requirements for outdoor and EV charging circuits. Older installations being inspected today are tested to current standards. That doesn’t mean every pre-2022 installation needs rewiring — observations are coded based on whether the departure from current standards represents an actual safety issue. A consumer unit pre-dating the 2022 amendment that’s otherwise sound is typically a C3 (improvement recommended) rather than a C2 (potentially dangerous).
Fittings and where they go
The visual inspection covers everything accessible without destruction: the consumer unit (cover off, devices and connections inspected), accessories throughout the property (sockets, switches, light fittings, ceiling roses, fan isolators, immersion switches), the meter cupboard, earthing and bonding at the main intake, and any outbuilding distribution boards. Findings are noted with photographs where useful. Common Gravesend findings: undersized consumer units missing RCD protection on older lighting circuits; mixed-metallic fittings and chrome sockets that show pitting where there’s been arcing; loose backbox screws on wall sockets; cracked switch plates; unprotected cable runs in loft spaces.

Testing schedule and remedials
Testing splits into dead testing (with the circuit isolated) and live testing (with the supply restored). Dead tests cover continuity of protective conductors, insulation resistance between live and earth, polarity, and ring final continuity on socket circuits. Live tests cover earth fault loop impedance, prospective fault current, and RCD operation times. Each circuit’s results are recorded individually on the schedule of test results that accompanies the certificate. For a typical three-bed property in Gravesend the on-site time is half a day. Larger or older properties with more circuits can take a full day. The brief power-down for dead testing on each circuit is usually a few minutes per circuit — long enough to put kettles and computers off the boil, short enough that nothing in the fridge defrosts.
Why Gravesend property owners book CJA Electrical
CJA Electrical is based in Rochester and covers EICR work across Gravesham from there. Gravesend sits within the 25-minute working radius — close enough that scheduling is tight, return visits for remedial work are easy, and you’re dealing with someone who knows the local stock. We do mostly residential EICR plus increasingly commercial fixed-wire work as the client base has grown. Qualifications: City & Guilds 2391 (Inspection & Testing), 2382 (18th Edition Wiring Regulations), and 2365 (Diploma in Electrical Installation). Calibrated test equipment. Certificates supplied as PDF inside 48 hours. Remedial work quoted separately so the price is clear and you can plan the budget.
How the work runs
Booking, inspection, report, remedials. Booking is a five-minute call or message — we need property details (size, type, rough age) and any access constraints (tenant in residence, agent involvement). Quote follows immediately for standard domestic EICR; capped quote after a site visit for larger or unusual installations. Inspection is scheduled for the next available slot (usually inside a week). Half a day on site for most Gravesend domestic property. Reports are drafted on the day, finalised within 48 hours, and supplied as a PDF. Remedials, if needed, are quoted line-by-line against the report observations.
What affects the price
EICR pricing is mostly driven by the size of the installation — circuit count more than floor area. A small flat with a single consumer unit and 6-8 circuits is at one end; a larger detached property with two consumer units, an outbuilding sub-board, and 20+ circuits is at the other. Most Gravesend three-bed homes come in as a fixed price after a brief chat about the property. What’s included: the on-site inspection, the testing, the written report, and certificate delivery as a PDF. Remedial work — if anything is unsatisfactory — is quoted separately so you can shop around if you want and so the inspection price stays clean and predictable.
FAQs
Can you do remedial work on the same visit?
Sometimes — minor remedials (replacing a damaged socket face, tightening a loose connection, fitting a missing blanking plate) can be done on the inspection visit if time and parts allow. Larger remedial work (consumer unit replacement, recircuiting, additional RCD protection) is quoted separately and scheduled as a follow-up.
Will the inspection damage anything?
No. The tests are non-destructive. Insulation resistance and earth fault loop are low-current measurements that don’t stress the installation. Most of the on-site work is visual inspection plus brief electrical testing on each circuit. The only disruption is the short power-downs during dead testing.
How quickly can I get a report after the inspection?
PDF inside 48 hours of testing completing. We can usually turn it around faster (same evening, next morning) if there’s a deadline — landlord renewal, sale exchange, insurance renewal — and we just need to know the deadline up front.
What if I disagree with an observation on the report?
Talk to us. Each observation has reasoning behind the coding — usually clear regulatory references — and we’ll walk through any specific item if you want to understand the call. Genuine reconsideration on borderline calls is fine; we don’t dig in for the sake of it.
Does an EICR cover gas, water, or appliances?
No. The EICR is a fixed-wiring inspection only — the consumer unit and circuits, plus accessories like sockets and switches. Gas certification is a Gas Safe registered engineer’s job; water leak detection is a plumber’s; appliance testing (PAT testing) is a separate service. We can refer to trusted local trades for any of those.
What if my property has more than one consumer unit?
Common in larger Gravesend properties — main board plus a garage or outbuilding sub-board, occasionally a separate board for a flat conversion or annexe. Each board is inspected separately and gets its own schedule of test results. The price reflects the additional testing time; we’ll confirm a fixed all-in number at quoting stage.
Related services in Gravesend
- Landlord EICR in Gravesend
- Emergency in Gravesend
- Alarms in Gravesend
- Emergency Lighting in Gravesend
- Commercial EICR in Gravesend
- Outdoor Lighting in Gravesend
EICR in nearby towns
- EICR in Northfleet — Gravesham
- EICR in Istead Rise — Gravesham
- EICR in Higham — Gravesham
- EICR in Rochester — Medway
Frequently asked questions
Can you do remedial work on the same visit?
Sometimes — minor remedials (replacing a damaged socket face, tightening a loose connection, fitting a missing blanking plate) can be done on the inspection visit if time and parts allow. Larger remedial work (consumer unit replacement, recircuiting, additional RCD protection) is quoted separately and scheduled as a follow-up.
Will the inspection damage anything?
No. The tests are non-destructive. Insulation resistance and earth fault loop are low-current measurements that don't stress the installation. Most of the on-site work is visual inspection plus brief electrical testing on each circuit. The only disruption is the short power-downs during dead testing.
How quickly can I get a report after the inspection?
PDF inside 48 hours of testing completing. We can usually turn it around faster (same evening, next morning) if there's a deadline — landlord renewal, sale exchange, insurance renewal — and we just need to know the deadline up front.
What if I disagree with an observation on the report?
Talk to us. Each observation has reasoning behind the coding — usually clear regulatory references — and we'll walk through any specific item if you want to understand the call. Genuine reconsideration on borderline calls is fine; we don't dig in for the sake of it.
Does an EICR cover gas, water, or appliances?
No. The EICR is a fixed-wiring inspection only — the consumer unit and circuits, plus accessories like sockets and switches. Gas certification is a Gas Safe registered engineer's job; water leak detection is a plumber's; appliance testing (PAT testing) is a separate service. We can refer to trusted local trades for any of those.
What if my property has more than one consumer unit?
Common in larger Gravesend properties — main board plus a garage or outbuilding sub-board, occasionally a separate board for a flat conversion or annexe. Each board is inspected separately and gets its own schedule of test results. The price reflects the additional testing time; we'll confirm a fixed all-in number at quoting stage.
Get a quote
Send a quick message and you'll get a same-day reply during working hours. Skip straight to phone or WhatsApp if you prefer.
Or skip the form: Call 07598 216512 WhatsApp info@cjaelectrical.co.uk