Office trunking and twin sockets in a commercial fit-out tested by CJA Electrical

For Gravesham business owners, building managers, and commercial landlords, the EICR is the piece of paper that closes the loop on the Electricity at Work Regulations 1989. CJA Electrical does the inspection, the test schedule, and (separately, if needed) the remedial work to clear observations. Most Northfleet commercial jobs are scheduled outside trading hours so the testing doesn’t disrupt the business.

What Commercial EICR actually is

Fixed wire testing — to use the term most commercial clients in Northfleet are familiar with — is a periodic inspection and test of every circuit in the building’s fixed installation. The inspection has two parts: a visual survey of the consumer unit, distribution boards, and accessible accessories, then dead and live electrical testing on each circuit (continuity, insulation resistance, polarity, earth fault loop, RCD operation). What lands on the report is a formal opinion of whether the installation is satisfactory or unsatisfactory against BS 7671, with each observation coded so the duty-holder knows what’s urgent and what isn’t. C1 means immediate danger, C2 potentially dangerous, C3 improvement recommended, FI further investigation required.

When you need Commercial EICR in Northfleet

The standard inspection cycle for commercial premises follows IET Guidance Note 3. For most Northfleet offices, retail units, and small workshops that’s five years. Industrial premises, educational buildings, and laboratories typically run on a three-year cycle. Higher-risk environments — cinemas, theatres, swimming pools, petrol stations, places of public assembly — sit on annual inspection. Beyond the periodic cycle, an EICR is commissioned at change of occupancy (new tenant taking over a unit), after major refurbishment, after a known fault or insurance claim, and on insurance request at policy renewal. We’ve also done a few in Northfleet where a sale is in progress and the buyer’s surveyor has flagged the electrics for further investigation.

Smaller domestic consumer unit with each circuit clearly labelled
Smaller domestic consumer unit with each circuit clearly labelled

Standards and what compliance looks like

BS 7671 is the technical standard for the work itself — what “satisfactory” looks like, what gets tested, the tolerances on each test, the format of the report. The Electricity at Work Regulations 1989 is the law that says the duty-holder must keep the installation safe and provides the framework for prosecution if they don’t. Together they’re the framework Northfleet duty-holders work within. The current edition of BS 7671 is the 18th Edition with Amendment 2 (2022); any EICR signed off after January 2023 should reference that. Reports referring to older editions of BS 7671 are still technically valid for the cycle they were issued in but should be re-tested to current standards on the next inspection.

Testing schedule and remedials

The standard test sequence is documented in BS 7671 Part 6 — inspection first, then dead tests, then live tests. We work circuit-by-circuit, isolating each in turn so the rest of the building stays live, which is what makes phased testing during business hours feasible on most Northfleet commercial premises. Once testing is done the report is drafted, including the schedule of test results, the schedule of inspections, and the list of observations. The duty-holder typically gets the certificate as a PDF within 48 hours of testing — quicker if there’s a deadline against an insurance renewal or a tenant move-in.

RCD and loop impedance testing in progress on a domestic circuit
RCD and loop impedance testing in progress on a domestic circuit

Why Northfleet property owners book CJA Electrical

CJA Electrical is based in Rochester and covers commercial work across the whole of Gravesham from there. Northfleet sits within the 28-minute working radius — close enough that scheduling around your trading hours and getting back for remedial work is a non-issue. The work is done by someone qualified to City & Guilds 2391 (Inspection & Testing) and 2382 (18th Edition Wiring Regulations), using calibrated test equipment, with reports produced in the standard BS 7671 format your insurer and managing agent recognise. No subcontracting — the person on site is the person signing the certificate.

How the work runs

First contact: a five-minute call to scope the premises. We need to know roughly what the installation looks like — number of distribution boards, three-phase or single-phase, number of circuits, whether there’s any specialist equipment (server rooms, plant, kitchens) that needs handling carefully. Most quotes go out within 24 hours of the initial call. Booking: testing scheduled around your hours. Most Northfleet offices are tested outside business hours; retail units are usually done early morning or evenings; workshops and industrial premises are sometimes done in phased blocks weekend-by-weekend if the building can’t shut down at all. Reporting: PDF within 48 hours, formatted to BS 7671 Appendix 6, with the schedule of test results, schedule of inspections, and observations all in the standard format insurers and managing agents expect to see.

What affects the price

Pricing is transparent: a fixed price for the inspection and report, separate quoting for any remedial work. The fixed price is set after a quick scoping conversation about the installation — circuit count, board count, three-phase or single-phase, any specialist equipment to handle. What the price includes: the on-site inspection, dead and live testing, schedule of test results, BS 7671-formatted report, PDF delivery within 48 hours. What’s separate: remedial work (quoted line-by-line against the report observations), any re-testing needed after remedials are completed, and any additional reports if the duty-holder wants the original split into board-specific certificates.

FAQs

What happens if the report comes back unsatisfactory?

Unsatisfactory just means the inspection has flagged C1 or C2 observations — items that need putting right to bring the installation back to compliance. The report lists each item, and CJA Electrical can quote separately for the remedial work. Once the remedials are done, the affected circuits are re-tested and a fresh, satisfactory certificate is issued.

Will the testing damage anything?

No. The tests are non-destructive — insulation resistance and earth fault loop are low-current measurements that don’t stress the installation. The most disruptive part is the brief power cuts during dead testing, which is why we schedule around operations. We do power-down sensitive equipment (servers, control systems) properly before testing the circuits that feed them, and we coordinate with you on anything that can’t be cleanly isolated.

Do you handle three-phase installations?

Yes. Three-phase is normal on commercial Northfleet premises with higher load — workshops, larger offices with mechanical plant, industrial units. Test equipment, methodology, and reporting formats are the same as single-phase but with phase-specific readings recorded on the schedule.

What documentation do I get at the end?

The Electrical Installation Condition Report itself (front page with verdict, schedule of inspections, schedule of test results, list of observations) as a single PDF. We can split it into board-specific certificates if you need separate documents for individual tenants in a multi-tenanted building. The PDF is what your insurer, Gravesham Borough Council, and any future buyer’s surveyor will expect to see.

How often does a commercial EICR need doing?

IET Guidance Note 3 is the reference. Five years is standard for offices, retail, and most small commercial in Northfleet. Three years for industrial, educational, and most workshop premises. One year for higher-risk environments — cinemas, swimming pools, places of public assembly. The duty-holder can shorten these intervals based on risk assessment, and most insurers require evidence the building is on cycle.

Related services in Northfleet

Commercial EICR in nearby towns

Frequently asked questions

What happens if the report comes back unsatisfactory?

Unsatisfactory just means the inspection has flagged C1 or C2 observations — items that need putting right to bring the installation back to compliance. The report lists each item, and CJA Electrical can quote separately for the remedial work. Once the remedials are done, the affected circuits are re-tested and a fresh, satisfactory certificate is issued.

Will the testing damage anything?

No. The tests are non-destructive — insulation resistance and earth fault loop are low-current measurements that don't stress the installation. The most disruptive part is the brief power cuts during dead testing, which is why we schedule around operations. We do power-down sensitive equipment (servers, control systems) properly before testing the circuits that feed them, and we coordinate with you on anything that can't be cleanly isolated.

Do you handle three-phase installations?

Yes. Three-phase is normal on commercial Northfleet premises with higher load — workshops, larger offices with mechanical plant, industrial units. Test equipment, methodology, and reporting formats are the same as single-phase but with phase-specific readings recorded on the schedule.

What documentation do I get at the end?

The Electrical Installation Condition Report itself (front page with verdict, schedule of inspections, schedule of test results, list of observations) as a single PDF. We can split it into board-specific certificates if you need separate documents for individual tenants in a multi-tenanted building. The PDF is what your insurer, Gravesham Borough Council, and any future buyer's surveyor will expect to see.

How often does a commercial EICR need doing?

IET Guidance Note 3 is the reference. Five years is standard for offices, retail, and most small commercial in Northfleet. Three years for industrial, educational, and most workshop premises. One year for higher-risk environments — cinemas, swimming pools, places of public assembly. The duty-holder can shorten these intervals based on risk assessment, and most insurers require evidence the building is on cycle.

Get a quote

Send a quick message and you'll get a same-day reply during working hours. Skip straight to phone or WhatsApp if you prefer.

EICR detail (helps with the quote)

Or skip the form: Call 07598 216512 WhatsApp info@cjaelectrical.co.uk