Labelled consumer unit in a rented property after a landlord EICR

Landlord EICR testing for Maidstone private rented property. Same-week appointments across the area, written report inside 48 hours of testing, certificates supplied in the BS 7671 Appendix 6 format that Maidstone Borough Council and every major letting agent recognises. Tenant access can be arranged via the agent or directly with the tenant — whichever is easier — and the inspection itself is non-disruptive enough to fit into a single morning or afternoon visit.

What Landlord EICR actually is

For rental property, the EICR is both a safety inspection and a compliance document. The safety side is what gets tested — the same inspection-and-test process as any EICR. The compliance side is what landlords actually need: documentary evidence, in a format Maidstone Borough Council accepts, that the installation meets BS 7671 at the date of inspection. The 2020 PRS regulations require a satisfactory report (no C1 or C2 observations) every five years and at the start of each new tenancy. Reports referencing C3 observations alone still pass. Unsatisfactory reports (C1 or C2 present) trigger a 28-day deadline for remedial work to be completed and a fresh certificate to be issued.

When you need Landlord EICR in Maidstone

Two specific triggers apply to landlord EICRs: every five years on a rolling cycle, and at the start of any new tenancy. For most Maidstone private rented property, that means the 5-year cycle is the main scheduling driver, with new-tenancy testing slotting in when properties change tenants between cycles. Beyond the regulatory triggers, common voluntary triggers we see in Maidstone: a portfolio acquisition (new landlord taking over property where the existing certificate is questionable), a major refurbishment (recircuiting, consumer unit replacement), insurance renewal where the underwriter has asked for a current certificate, and council action where a tenant complaint has triggered an enforcement visit.

Multifunction tester measuring end-to-end resistance on a ring final circuit
Multifunction tester measuring end-to-end resistance on a ring final circuit

Standards and what compliance looks like

The two pieces of paperwork that matter on a landlord EICR are the certificate itself (signed against BS 7671:2018+A2:2022) and the schedule of test results (the appendix recording each individual circuit’s test measurements). Both go to the tenant within 28 days of the inspection and to the council within 7 days of any request. Standards-wise, landlord EICRs aren’t held to a different technical bar than owner-occupied EICRs — same Wiring Regulations, same observation codes, same testing tolerances. The difference is the regulatory wrapper: defined cycle, defined paper trail, defined penalties.

Testing schedule and remedials

The testing process on a landlord EICR is the same as any other — visual inspection first, then dead testing (continuity, insulation resistance, polarity, ring final continuity), then live testing (earth fault loop, RCD operation). What’s different on rental property is just the access logistics: we coordinate with the agent or tenant to schedule a single visit when they can be in, work around the brief power-downs during dead testing, and leave the property exactly as we found it. Most Maidstone rental property comes in as a half-day visit for a typical three-bed home, with the report supplied as a PDF inside 48 hours of testing completing. For larger HMOs or multi-occupancy conversions, the on-site time can extend to a full day.

RCD and loop impedance testing in progress on a domestic circuit
RCD and loop impedance testing in progress on a domestic circuit

Why Maidstone property owners book CJA Electrical

CJA Electrical works with private landlords and letting agents across Maidstone. Maidstone sits within the 30 -minute working radius of our Rochester base, so scheduling around tenant availability is straightforward and re-tests after remedial work happen quickly. What landlords and agents tell us matters: same-week appointments, certificates inside 48 hours, reports formatted to satisfy Maidstone Borough Council requests, and remedial work quoted clearly so the budget decision is straightforward. Same person on site, same person signing the certificate, no subcontracting.

How the work runs

Step one — the booking. We need property details (address, bedrooms, rough age of installation, any known issues) and the contact for tenant access (agent or tenant direct). Quote confirmed on that call for standard property; site visit first for unusual installations or HMO conversions. Step two — the testing visit. Half a day for most Maidstone three-bed rental property; longer for HMOs and larger conversions. Brief power-downs during dead testing flagged in advance to the tenant. Property left exactly as found. Step three — the report. PDF inside 48 hours, supplied to landlord and agent. Remedials, if needed, quoted separately. Re-test scheduled once remedials are complete.

What affects the price

Pricing is transparent. A fixed price for the inspection, testing, and report, set on a brief scoping call with the agent or landlord. Separate quoting for any remedial work based on the report observations. Larger HMOs, multi-occupancy conversions, or properties with multiple consumer units get a capped quote after a quick site visit. The cap means certainty on the maximum cost going in. Re-tests after remedials are included in the original inspection price for the affected circuits.

FAQs

What if the report is unsatisfactory?

An unsatisfactory report just means there are C1 or C2 observations that need clearing before the property is compliant. CJA Electrical can quote separately for the remedial work, and once it’s done a re-test confirms the installation is satisfactory. A fresh certificate is issued documenting the post-remedial state.

Do I need a fresh EICR every time I get a new tenant?

Not necessarily. The 2020 regulations say a satisfactory EICR must be in place at the start of any new tenancy. If the existing certificate is current (less than 5 years old) and the property hasn’t been altered since, that certificate is valid for the new tenancy too. A fresh EICR is only legally required if the existing one is expired, missing, or unsatisfactory.

Will the inspection disrupt my tenant?

Minimally. The on-site time is half a day for a typical three-bed home. Brief power-downs during dead testing are a few minutes per circuit. The tenant doesn’t need to stay in for the whole visit — just to provide access at the start. We work quietly and leave the property exactly as we found it.

How fast can I get a certificate if I need one urgently?

Same-week is standard. If a tenant move-in or insurance renewal deadline is tight, we can usually fit an inspection in within 24-48 hours of booking. Reports are turned around same-evening or next-morning where the deadline calls for it — just let us know up front.

Do I need a separate certificate for each property in my portfolio?

Yes. Each rental property needs its own EICR — addresses, circuit details, and observations are property-specific. For portfolio landlords with several properties due at the same time, we can schedule the visits efficiently and bulk-deliver the certificates so the agent has the full portfolio in hand at once.

What about EICRs for HMOs?

HMO landlord EICRs follow the same 5-yearly cycle as ordinary rented homes, but typically also align with the HMO licence cycle issued by Maidstone Borough Council. HMOs often have shared common-parts circuits (corridor lighting, fire alarm interface, escape route lighting) that get tested separately. We work to whatever the council specifically requires for the licence renewal.

Do I have to do an EICR every 5 years on a rental?

Yes. Since June 2020, every privately rented home in England must have a satisfactory EICR every 5 years and at the start of each new tenancy. The certificate must be supplied to tenants within 28 days of the inspection and to Maidstone Borough Council on request within 7 days.

Related services in Maidstone

Landlord EICR in nearby towns

Frequently asked questions

What if the report is unsatisfactory?

An unsatisfactory report just means there are C1 or C2 observations that need clearing before the property is compliant. CJA Electrical can quote separately for the remedial work, and once it's done a re-test confirms the installation is satisfactory. A fresh certificate is issued documenting the post-remedial state.

Do I need a fresh EICR every time I get a new tenant?

Not necessarily. The 2020 regulations say a satisfactory EICR must be in place at the start of any new tenancy. If the existing certificate is current (less than 5 years old) and the property hasn't been altered since, that certificate is valid for the new tenancy too. A fresh EICR is only legally required if the existing one is expired, missing, or unsatisfactory.

Will the inspection disrupt my tenant?

Minimally. The on-site time is half a day for a typical three-bed home. Brief power-downs during dead testing are a few minutes per circuit. The tenant doesn't need to stay in for the whole visit — just to provide access at the start. We work quietly and leave the property exactly as we found it.

How fast can I get a certificate if I need one urgently?

Same-week is standard. If a tenant move-in or insurance renewal deadline is tight, we can usually fit an inspection in within 24-48 hours of booking. Reports are turned around same-evening or next-morning where the deadline calls for it — just let us know up front.

Do I need a separate certificate for each property in my portfolio?

Yes. Each rental property needs its own EICR — addresses, circuit details, and observations are property-specific. For portfolio landlords with several properties due at the same time, we can schedule the visits efficiently and bulk-deliver the certificates so the agent has the full portfolio in hand at once.

What about EICRs for HMOs?

HMO landlord EICRs follow the same 5-yearly cycle as ordinary rented homes, but typically also align with the HMO licence cycle issued by Maidstone Borough Council. HMOs often have shared common-parts circuits (corridor lighting, fire alarm interface, escape route lighting) that get tested separately. We work to whatever the council specifically requires for the licence renewal.

Do I have to do an EICR every 5 years on a rental?

Yes. Since June 2020, every privately rented home in England must have a satisfactory EICR every 5 years and at the start of each new tenancy. The certificate must be supplied to tenants within 28 days of the inspection and to Maidstone Borough Council on request within 7 days.

Get a quote

Send a quick message and you'll get a same-day reply during working hours. Skip straight to phone or WhatsApp if you prefer.

EICR detail (helps with the quote)

Or skip the form: Call 07598 216512 WhatsApp info@cjaelectrical.co.uk