Labelled consumer unit in a rented property after a landlord EICR

CJA Electrical does landlord EICR work across Bearsted and the wider Maidstone area — private landlords with one or two rentals, accidental landlords renting out a former main residence, and letting agents managing multi-property portfolios. The 2020 PRS regulations set the cycle (every 5 years and at the start of any new tenancy) and the consequences for non-compliance (civil penalties up to £30,000 from Maidstone Borough Council). The work runs out of Rochester and Bearsted sits within a 32-minute reach.

What Landlord EICR actually is

Landlord EICRs are governed by the Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020. The inspection and the technical standards are the same as any other EICR — BS 7671:2018+A2:2022, observation codes, dead and live testing — but the regulations layer on top a defined cycle (5 years), a defined documentation flow (tenants and council get copies), and defined consequences (civil penalties up to £30,000 for non-compliance). The inspector’s job is the same regardless of who’s commissioning the work. What’s different is the paperwork and the deadlines — keeping the cycle on schedule, getting the certificate to the tenant inside 28 days, supplying it to the council if asked.

When you need Landlord EICR in Bearsted

The legal cycle: every 5 years, plus the start of any new tenancy. The practical cycle: book a couple of months early so any remedials don’t bring you up against the deadline. Maidstone Borough Council can serve a remedial notice requiring work within a fixed timescale if a property is found non-compliant during enforcement; civil penalties up to £30,000 apply for landlords who ignore the notice. For new-build or fully recircuited property, the first 5-yearly EICR is due 5 years after the original Electrical Installation Certificate (EIC) was issued — not 5 years after the property was let. That distinction occasionally catches landlords out on properties that were rented mid-way through the original install warranty.

Main service fuse, cutout and smart meter on the incoming supply
Main service fuse, cutout and smart meter on the incoming supply

Standards and what compliance looks like

Two regulatory references apply: BS 7671:2018+A2:2022 (the technical standard the inspection works to) and the Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020 (the law requiring the inspection in the first place). BS 7671 sets out what gets tested, what passes, what fails, and how observations are coded. The 2020 PRS regulations set the cycle, the documentation requirements, and the consequences for non-compliance. Reports formatted to BS 7671 Appendix 6 are accepted by Maidstone Borough Council and across the private rented sector industry.

Testing schedule and remedials

The testing process on a landlord EICR is the same as any other — visual inspection first, then dead testing (continuity, insulation resistance, polarity, ring final continuity), then live testing (earth fault loop, RCD operation). What’s different on rental property is just the access logistics: we coordinate with the agent or tenant to schedule a single visit when they can be in, work around the brief power-downs during dead testing, and leave the property exactly as we found it. Most Bearsted rental property comes in as a half-day visit for a typical three-bed home, with the report supplied as a PDF inside 48 hours of testing completing. For larger HMOs or multi-occupancy conversions, the on-site time can extend to a full day.

Multi-occupancy meter cupboard with separate consumer units and smart meters
Multi-occupancy meter cupboard with separate consumer units and smart meters

Why Bearsted property owners book CJA Electrical

CJA Electrical works with private landlords and letting agents across Maidstone. Bearsted sits within the 32 -minute working radius of our Rochester base, so scheduling around tenant availability is straightforward and re-tests after remedial work happen quickly. What landlords and agents tell us matters: same-week appointments, certificates inside 48 hours, reports formatted to satisfy Maidstone Borough Council requests, and remedial work quoted clearly so the budget decision is straightforward. Same person on site, same person signing the certificate, no subcontracting.

How the work runs

First contact: phone call, email, or WhatsApp to confirm the property details (address, size, rough age of consumer unit) and the access route (direct with tenant, or via agent). Most quotes are confirmed on that initial call as a fixed price. Booking: tenant access arranged via the agent or directly with the tenant. We work around tenant schedules — most testing visits land in a single morning or afternoon. Re-test appointments after remedials are scheduled at the same time for continuity. Reporting: PDF inside 48 hours, supplied to the landlord, the agent, or both. If unsatisfactory, remedial work is quoted line-by-line against the report observations, and a re-test is booked once the work is done.

What affects the price

The two factors that move Bearsted landlord EICR pricing are circuit count (more circuits = more testing time) and access (single visit with full tenant cooperation versus multiple return visits). For straightforward domestic rental property with cooperative tenant access, the price is well-established and quoted up-front. What we don’t do: deposits, hidden charges, or fees beyond the quoted price. The fixed price is what’s invoiced on completion. Remedials are separate so the EICR price is the EICR price.

FAQs

Do I have to do an EICR every 5 years on a rental?

Yes. Since June 2020, every privately rented home in England must have a satisfactory EICR every 5 years and at the start of each new tenancy. The certificate must be supplied to tenants within 28 days of the inspection and to Maidstone Borough Council on request within 7 days.

What happens if I don’t have a current EICR?

Maidstone Borough Council can serve a remedial notice requiring you to bring the installation into compliance within a fixed timescale, and can issue civil penalties of up to £30,000 for non-compliance. Insurers may also refuse to honour claims related to electrical incidents on properties without current certification.

How is tenant access arranged?

Either through your letting agent or directly with the tenant — whichever is easier for you. We coordinate the visit a few days in advance, confirm the appointment with the tenant, and work around their schedule for the testing visit itself. Most testing visits take a single morning or afternoon.

Can the certificate be sent direct to my agent?

Yes. The PDF can go to you, your letting agent, your council, or all of the above. Maidstone Borough Council accepts the standard BS 7671 Appendix 6 format, as do all the major letting agents and managing agents we’ve worked with.

What if the report is unsatisfactory?

An unsatisfactory report just means there are C1 or C2 observations that need clearing before the property is compliant. CJA Electrical can quote separately for the remedial work, and once it’s done a re-test confirms the installation is satisfactory. A fresh certificate is issued documenting the post-remedial state.

Related services in Bearsted

Landlord EICR in nearby towns

Frequently asked questions

Do I have to do an EICR every 5 years on a rental?

Yes. Since June 2020, every privately rented home in England must have a satisfactory EICR every 5 years and at the start of each new tenancy. The certificate must be supplied to tenants within 28 days of the inspection and to Maidstone Borough Council on request within 7 days.

What happens if I don't have a current EICR?

Maidstone Borough Council can serve a remedial notice requiring you to bring the installation into compliance within a fixed timescale, and can issue civil penalties of up to £30,000 for non-compliance. Insurers may also refuse to honour claims related to electrical incidents on properties without current certification.

How is tenant access arranged?

Either through your letting agent or directly with the tenant — whichever is easier for you. We coordinate the visit a few days in advance, confirm the appointment with the tenant, and work around their schedule for the testing visit itself. Most testing visits take a single morning or afternoon.

Can the certificate be sent direct to my agent?

Yes. The PDF can go to you, your letting agent, your council, or all of the above. Maidstone Borough Council accepts the standard BS 7671 Appendix 6 format, as do all the major letting agents and managing agents we've worked with.

What if the report is unsatisfactory?

An unsatisfactory report just means there are C1 or C2 observations that need clearing before the property is compliant. CJA Electrical can quote separately for the remedial work, and once it's done a re-test confirms the installation is satisfactory. A fresh certificate is issued documenting the post-remedial state.

Get a quote

Send a quick message and you'll get a same-day reply during working hours. Skip straight to phone or WhatsApp if you prefer.

EICR detail (helps with the quote)

Or skip the form: Call 07598 216512 WhatsApp info@cjaelectrical.co.uk