Domestic consumer unit with CJA Electrical inspection sticker on completion

Vendor-side EICR work for homeowners selling property in Maidstone. The inspection is the same standard test as any domestic EICR — what’s different is the timing. Done before listing, the certificate goes into the contract pack alongside other vendor documentation. Done after offer-accepted, it can still head off renegotiation if the buyer’s surveyor has flagged the electrics.

What an EICR involves for Pre-Sale

Pre-sale inspection follows BS 7671:2018+A2:2022 with the same scope as any domestic EICR — consumer unit, accessible accessories, supply route, earthing and bonding, then circuit-level testing for continuity, insulation resistance, polarity, earth fault loop impedance, and RCD operation. Findings get coded C1, C2, C3, FI per the standard. The deliverable is the standard three-part EICR PDF, ready to slot into the conveyancing pack.

When you need this in Maidstone

Pre-sale EICR is most useful when the alternative is finding out at survey stage that the electrics are a problem. Maidstone property fitting that profile: anything Victorian or Edwardian, anything with original 1960s wiring still in service, anything with a consumer unit older than twenty years, and any conversion or significantly extended property where the wiring history isn’t well documented.

Multifunction tester measuring end-to-end resistance on a ring final circuit
Multifunction tester measuring end-to-end resistance on a ring final circuit

What the report contains

The deliverable is the standard EICR PDF. Plain-English cover note where useful for the vendor’s solicitor; technical schedules behind for the buyer’s surveyor or solicitor to refer to. Failed reports include a remedial quote alongside, so there’s never a gap between finding the problem and being able to do something about it.

Why book CJA Electrical for your Maidstone EICR

The pitch: ten years on Maidstone domestic property, including period housing in Maidstone where pre-sale inspections are most common. Same-week appointments, written report inside 48 hours, remedials quoted clearly so the vendor can decide whether to fix pre-listing or post-offer.

RCD and loop impedance testing in progress on a domestic circuit
RCD and loop impedance testing in progress on a domestic circuit

How the inspection runs

Standard pre-sale flow: Conversation about the property and timing. Quote confirms the price. Booking arranged around viewings. Inspection visit. Report supplied as PDF inside 48 hours. Remedial quotes attached where needed. From first call to certificate in your inbox is typically under a week; full inspection-to-clean-certificate cycle (including any remedials) under a fortnight.

What affects the price

No published prices because the variables genuinely matter. Circuit count, consumer unit type, accessibility, and age of the wiring all affect the inspection time. Maidstone stock varies considerably. Same-day fixed quote, no deposit, payment on completion.

FAQs

Will the EICR check things like the boiler and gas?

No — EICR scope is fixed wiring only. Boiler safety is covered by a separate Gas Safety check (CP12) carried out by a Gas Safe registered engineer; the boiler’s wiring and switching is in EICR scope but the boiler itself is not. For pre-sale documentation on a property with a gas boiler, you’d typically have both.

Can I get the EICR done while the property is empty between owners?

Yes — vacant property is the easiest to inspect because access isn’t constrained by a tenant or homeowner’s schedule. We can usually fit empty-property inspections on shorter notice. The certificate names the property and is dated; it’s still valid evidence regardless of whether the property is occupied at inspection.

Should I get an EICR before listing my house in Maidstone?

If the property’s older than the late 1980s and the consumer unit is original, yes — a pre-sale EICR is the cheap insurance against the buyer’s surveyor flagging the electrics post-offer. For modern stock with a recent consumer unit, the value is lower. Worth a phone call to talk through the property before booking either way.

How long is a pre-sale EICR valid for?

EICRs don’t have a formal validity period in the same way a tenancy-related certificate does. In practice, buyers and their solicitors accept reports up to about five years old; older than that and a fresh inspection is usually preferable. For older Maidstone stock specifically, a recent report carries more weight than an older one. The IET recommends ten-yearly inspections on owner-occupied homes as a baseline.

Can my EICR be used by the buyer for their due diligence?

Yes — that’s the point. A vendor-commissioned EICR is supplied to the buyer through the conveyancing process, normally as part of the contract pack. The buyer is free to commission their own inspection if they want a second opinion, but most don’t bother when a recent satisfactory report is already on file. Saves time and cost on both sides.

What if I get an unsatisfactory pre-sale EICR?

You have options. Fix the issues pre-listing (clean certificate goes in the contract pack); fix them during marketing and supply the fresh certificate at offer-accepted; or disclose the unsatisfactory report and price the property accordingly. Most Maidstone vendors choose to fix pre-listing because it’s usually the smallest impact on the asking price. We quote the remedial work alongside the report so you can decide quickly.

Pre-Sale EICR in nearby towns

EICR for other audiences in Maidstone

Get a quote

Send a quick message and you'll get a same-day reply during working hours. Skip straight to phone or WhatsApp if you prefer.

EICR detail (helps with the quote)

Or skip the form: Call 07598 216512 WhatsApp info@cjaelectrical.co.uk