Developer EICR in Larkfield
Developer compliance for electrical work splits into two streams. New installations — circuits added during build, refurb, or conversion — produce an Electrical Installation Certificate (EIC) at commissioning. Existing installations being inspected periodically produce an EICR. We work with Larkfield developers on both: EIC for new work signed off as it goes in, EICR on existing installations inherited through purchase or returned to service after refurb.
Developer compliance for electrical work splits into two streams. New installations — circuits added during build, refurb, or conversion — produce an Electrical Installation Certificate (EIC) at commissioning. Existing installations being inspected periodically produce an EICR. We work with Larkfield developers on both: EIC for new work signed off as it goes in, EICR on existing installations inherited through purchase or returned to service after refurb.
What an EICR involves for Developer
The technical inspection runs to BS 7671:2018+A2:2022 — same standard as any other domestic EICR. What differs for developer work is the trigger and the handover. A refurbishment EICR captures the state of an existing installation at the start or end of the works, so the developer has clean evidence of what was inherited and what was kept. Where new circuits are added to an existing installation as part of the works, those new circuits also get an Electrical Installation Certificate (EIC) at commissioning — separate document, separate purpose.
When you need this in Larkfield
Common developer scenarios for an EICR in Larkfield: - Acquisition due diligence on a property being purchased for refurbishment - Pre-refurb baseline EICR documenting the existing installation’s condition - Post-refurb EICR confirming the kept-and-adapted wiring is still satisfactory - Change-of-use conversion EICR — house to flats, commercial to residential, etc. - Periodic inspection on completed phases of a development already in service - EICR alongside an EIC on a project mixing new circuits and retained existing wiring

What the report contains
Standard three-part EICR deliverable: form, schedule of inspection, schedule of test results. For phased developments, we’ll commonly supply a plot-by-plot summary alongside the individual reports so the developer’s project tracker has a single overview document. Where new circuits sit alongside retained wiring, we’ll issue the appropriate EIC for the new work in addition to the EICR for the retained installation. Two documents, two purposes.
Why book CJA Electrical for your Larkfield EICR
What developers usually want from an EICR partner is precision and timing. Precision because the EIC vs EICR distinction matters and gets it wrong on BC sign-off. Timing because the inspection slot has to fit a wider project programme, often with multiple trades on site. City & Guilds 2391 qualified for the inspection and testing, ten years on Maidstone domestic projects, comfortable working alongside other trades on a live site. Same-week turnaround typical for Larkfield projects.

How the inspection runs
The developer flow: Initial conversation about the project — what’s existing, what’s new, where on the programme the inspection sits. Quote and appointment options out the same day. Inspection coordinated with the site lead. Report PDF inside 48 hours. EIC for new circuits issued separately as work is commissioned. Remedial work, if needed, scoped and quoted to fit the wider build cost.
What affects the price
Developer EICR work is priced per inspection scope. Refurbishment baseline EICR on a single dwelling is priced like a domestic EICR. Phased-development work is priced per plot or per block depending on what’s being inspected. EIC work for new circuits is priced separately by circuit count. Get in touch with the project scope and we’ll come back with a fixed quote.
FAQs
Can you work alongside other trades on a live site in Larkfield?
Yes. Most of our developer work happens on live sites with other trades present. We coordinate with the site manager or principal contractor to fit the inspection slot into the wider programme, and we work to the site’s H&S and access protocols. Larkfield sites are reached from our Rochester base in around 28 minutes.
Do you supply documentation in a format Building Control accepts?
Yes. EICs and EICRs follow the standard BS 7671 formats that Building Control bodies accept across England. Standard three-part EICR PDF — form, schedule of inspection, schedule of test results — and standard EIC for new circuits with the matching schedule of test results.
How quickly can you turn EICR work round on a developer project?
Same-week appointments are typical for Larkfield projects, with the report PDF in the project inbox within 48 hours of the visit. For phased developments where multiple plots need inspecting, we batch the visits to keep the cost down and the turnaround tight. Tighter timelines are possible where the project programme demands it.
Do I need an EICR on a property I’ve just bought to refurbish?
Not strictly required by law, but it’s standard due diligence. A pre-refurb EICR documents the condition of the existing installation before any work starts, which protects you if findings emerge later. Where the refurb plan involves keeping significant parts of the existing wiring, the EICR is also useful evidence that what’s being retained is still satisfactory.
What about Building Regulations notification on new circuits?
New circuits in dwellings are notifiable work under Building Regulations in England. We issue the appropriate Electrical Installation Certificate (EIC) at commissioning and the developer’s Building Control body takes the notification through standard channels. We don’t act as a self-certification scheme but the EIC documentation is what the BC body needs to sign off the work.
Developer EICR in nearby towns
- Developer EICR in Aylesford — Maidstone
- Developer EICR in Ditton — Maidstone
- Developer EICR in Kings Hill — Tonbridge and Malling
EICR for other audiences in Larkfield
Get a quote
Send a quick message and you'll get a same-day reply during working hours. Skip straight to phone or WhatsApp if you prefer.
Or skip the form: Call 07598 216512 WhatsApp info@cjaelectrical.co.uk