Smaller domestic consumer unit with each circuit clearly labelled

A pre-purchase EICR sits in a tight window — between the buyer’s offer being accepted and the property exchange — when the buyer needs hard evidence of the electrical condition before committing. CJA Electrical handles these inspections across Snodland and Tonbridge and Malling, working with buyers, solicitors, and (where the vendor co-operates) directly with the existing homeowner on access.

What an EICR involves for Pre-Purchase

Pre-purchase inspection covers the consumer unit, every accessible accessory, supply route and earthing, then circuit-level testing for continuity, insulation resistance, polarity, earth fault loop, and RCD operation. Standard BS 7671 scope. The deliverable is the standard EICR PDF, often with a plain-English cover summary so the buyer can see at a glance what the report says without needing to translate the technical schedule.

When you need this in Snodland

Most pre-purchase EICRs we do for Snodland buyers fall into one of these: - Older property where the survey flagged electrics - Ex-rental coming back to the owner-occupier market with patchy paperwork - Probate sale where the EICR history is incomplete or non-existent - Investor purchase where the BTL conversion plan needs a baseline - Property where the buyer’s surveyor specifically recommended further inspection - Period property in Tonbridge and Malling where the surveyor’s report flagged a dated consumer unit

Modern RCBO consumer unit after a satisfactory EICR
Modern RCBO consumer unit after a satisfactory EICR

What the report contains

Reports come back as the standard EICR PDF — three parts (form, schedule of inspection, schedule of test results) all in one document. The format every solicitor and surveyor recognises. Failed reports come with a remedial-work quote attached. The buyer can use the quote as a basis for renegotiation with the vendor — typical ask is the vendor reduces the price by the remedial cost or has the work done before exchange.

Why book CJA Electrical for your Snodland EICR

For pre-purchase work the inspector needs to be quick (offer-to-exchange windows are usually short), thorough (the buyer’s making a major decision based on the report), and clear (the buyer often isn’t a technical expert). Same-week appointments, written PDF inside 48 hours, plain-English summary on the front, technical schedule behind. City & Guilds 2391 qualified inspector, ten years on Tonbridge and Malling property, fully insured.

Multifunction tester measuring end-to-end resistance on a ring final circuit
Multifunction tester measuring end-to-end resistance on a ring final circuit

How the inspection runs

Pre-purchase inspection flow: Initial call to scope the property and confirm timing. Quote out same day. Booking arranged through the vendor or estate agent. Inspection visit. Report supplied as PDF inside 48 hours. Remedials, if any, quoted with the report. From offer-accepted to inspection-complete is typically a fortnight, leaving plenty of time before exchange to act on the findings.

What affects the price

No published prices — too much variation between Snodland properties to make a single number meaningful. The quote depends on the inspection scope; same-day fixed price agreed before the visit. Buyer pays direct unless negotiation lands the cost on the vendor.

FAQs

How much does a pre-purchase EICR usually save?

Hard to generalise — depends on what the inspection finds. On older Snodland stock, a pre-purchase EICR commonly identifies remedial work that costs more than the inspection itself, and the buyer either negotiates the cost off the price or has the vendor instructed to fix. On modern stock with no findings, the value is the peace of mind rather than the renegotiation lever.

Should I get one even if the survey didn’t flag the electrics?

Worth considering on older property even if the survey was clean on electrics. Surveyors do a visual check — they don’t open up consumer units, lift floorboards, or do circuit-level testing. An EICR catches things a visual survey can’t. For modern property post-2010, a pre-purchase EICR is rarely worth the cost; for anything older, it’s increasingly common buyer due diligence.

Can my solicitor request the EICR on my behalf?

Solicitors typically don’t commission technical inspections directly — that’s between the buyer and the inspector. What your solicitor will do is incorporate the EICR findings into the contract negotiations, raise enquiries with the vendor’s solicitor about any unsatisfactory findings, and (where appropriate) include conditions about remedial work in the contract before exchange.

Can I commission an EICR between offer and exchange?

Yes — that’s the standard pre-purchase pattern. Once your offer’s been accepted, you can commission an EICR direct as the prospective buyer. Access is arranged through the estate agent or with the vendor’s co-operation. The inspection itself is a single visit, the report is back inside 48 hours, and you have evidence of the electrical condition well before exchange.

Will the seller cover remedial work flagged by my pre-purchase EICR?

It depends on the negotiation. Where the survey or pre-purchase EICR flags significant remedial work, buyers commonly negotiate either a price reduction equal to the remedial cost, or an instruction for the vendor to complete the work before exchange. Whether the vendor agrees is a commercial conversation; the EICR provides the factual basis for the discussion.

Pre-Purchase EICR in nearby towns

EICR for other audiences in Snodland

Get a quote

Send a quick message and you'll get a same-day reply during working hours. Skip straight to phone or WhatsApp if you prefer.

EICR detail (helps with the quote)

Or skip the form: Call 07598 216512 WhatsApp info@cjaelectrical.co.uk