Fully labelled domestic consumer unit after EICR testing

HMOs in Higham are typically inspected on the same five-year EICR cycle as standard rented property, but with the HMO licence from Gravesham Borough Council specifying it as a licence condition rather than just the PRS regulations. Practical difference: the council follows up on missing certificates more actively, and the inspection scope often includes verification of fire alarm interface circuits and emergency lighting.

What an EICR involves for HMO

Inspection covers the consumer unit (plural in larger HMOs), accessible accessories on every floor and in every let bedroom, shared circuits in common parts, and the supply / earthing arrangements. Testing covers every circuit individually for continuity, insulation resistance, polarity, earth fault loop impedance, and RCD operation. For HMOs with hardwired fire alarm or emergency lighting, those circuits are verified for correct supply and protection as part of the EICR even though the alarm/EM lighting maintenance regime is separate.

When you need this in Higham

HMO landlords in Higham typically book us in for one of these: Five-yearly renewal where the existing certificate is approaching expiry. HMO licence renewal where the council has asked for current safety documentation. New HMO acquisition where the previous licence holder’s paperwork is patchy. Major works completed and a fresh EICR is needed to document the new installation. Or a complaint-driven Gravesham Borough Council audit that’s surfaced missing certificates across the portfolio.

Multifunction tester measuring end-to-end resistance on a ring final circuit
Multifunction tester measuring end-to-end resistance on a ring final circuit

What the report contains

The deliverable is the standard EICR PDF. For larger HMOs with multiple consumer units, each consumer unit gets its own circuit tabulation in the schedule of test results so it’s clear which circuits sit on which board. The form is the form Gravesham Borough Council expects in the HMO licence file. Failed reports come with remedials quoted alongside; re-test on completion issues a fresh satisfactory certificate.

Why book CJA Electrical for your Higham EICR

For HMO compliance, the right inspector knows what extra to look at. Shared kitchen circuits with multiple high-load appliances on the same ring main. Fire detection circuits hardwired through a panel. Emergency lighting feeds. Multiple consumer units in larger conversions. Ten years on Gravesham domestic and HMO property means we’ve seen the patterns and don’t need everything explained from scratch.

Inside a fully wired domestic consumer unit
Inside a fully wired domestic consumer unit

How the inspection runs

HMO-specific process notes: For shared HMOs we’ll typically need access to every let bedroom plus the common parts (kitchen, lounge, bathrooms, hallways). Coordination with each tenant on access is usually easier than trying to do it all on one visit — we’ll often book the inspection across two days for larger properties to fit tenant schedules. Report comes back in single PDF regardless of how many visits the inspection took.

What affects the price

No standard rate card — HMOs vary too much. Quote depends on the let bedroom count, the consumer unit configuration, and whether the fire detection / emergency lighting circuit verification is in scope. Same-day quote, no deposit, fixed price agreed before the visit.

FAQs

Do you handle EICR alongside fire alarm certification?

We handle the EICR side and the fire alarm circuit verification within the EICR scope. The annual fire alarm system test and certification (BS 5839-1 for larger systems) is usually a separate specialist’s job, though we can fit smoke and heat alarms to BS 5839-6 for smaller HMO conversions — see the smoke alarm installation page for detail.

What about emergency lighting in HMO common parts?

HMOs with shared common parts typically need emergency lighting under BS 5266. We treat the emergency lighting circuit verification as part of the EICR but the dedicated emergency lighting installation, testing, and certification is its own service — see the emergency lighting page for detail. Both can be coordinated together for HMO compliance projects.

Can the EICR be done across multiple visits if tenants are difficult?

Yes. For larger HMOs, splitting the inspection across two visits is often the easiest answer to tenant access constraints. The schedule of inspection captures what was checked on which date, and the report itself is issued as a single PDF on completion. Remedial work quoted at the end of the second visit covers the whole property.

Will I need a fresh EICR if I’m adding another bedroom to my HMO?

Yes — adding bedrooms means new circuits, additional accessories, and often a change in licence category. The new work itself gets an Electrical Installation Certificate (EIC) at commissioning, and a fresh EICR on the wider installation is sensible to document the post-conversion state. Gravesham Borough Council will typically expect both documents at the licence variation stage.

Do you work with HMO managing agents on portfolio compliance?

Yes — and we’d usually prefer to. Single point of contact, batched inspection visits across a portfolio, consistent reporting format, and remedial-work quoting alongside any unsatisfactory reports. See the letting agency page for the full portfolio framework approach.

Does my HMO licence with Gravesham Borough Council require an EICR?

Yes — almost always. Gravesham Borough Council typically lists a current satisfactory EICR as a standard condition of the HMO licence, with renewal cycle aligned to the licence renewal cycle. Specific requirements vary by licence type (mandatory, additional, or selective licensing) but a satisfactory EICR is a near-universal expectation. The council will ask to see it on licence renewal and on inspection.

What extra checks apply to HMOs vs single-lets?

The standard EICR scope applies to both, but HMO inspections typically take longer because shared circuits carry higher fault loading and multiple consumer units are common. Where the property has hardwired fire detection or emergency lighting (most HMOs over a certain size do), those circuit feeds are verified as part of the EICR even though the alarm/lighting maintenance regime is separate.

HMO EICR in nearby towns

EICR for other audiences in Higham

Get a quote

Send a quick message and you'll get a same-day reply during working hours. Skip straight to phone or WhatsApp if you prefer.

EICR detail (helps with the quote)

Or skip the form: Call 07598 216512 WhatsApp info@cjaelectrical.co.uk