EICR in Tonbridge
EICR testing in Tonbridge, with same-week appointments across Tonbridge and Malling.
Periodic inspection and testing in Tonbridge — what most people just call an EICR. The work covers a visual inspection of the consumer unit and accessible accessories, dead and live testing on every circuit, and a written report with each observation coded against BS 7671. Common drivers in Tonbridge and Malling: a 5-yearly landlord check, a pre-sale or pre-purchase EICR, an insurer asking for current documentation, or a homeowner whose installation hasn’t been tested in a decade.
What EICR actually is
“EICR” is short for Electrical Installation Condition Report — the formal documentation of a fixed-wiring inspection at a specific point in time. It tells you the condition of the installation today, lists anything that doesn’t meet current regulations, and gives the property owner a punchlist of what needs putting right. The report is what’s accepted as evidence of compliance — by Tonbridge and Malling Borough Council for landlords subject to the 2020 PRS regulations, by surveyors during a sale, by insurers at renewal, and by managing agents at change of tenancy. Reports formatted to the BS 7671 standard layout are recognised universally across the industry.
When you need EICR in Tonbridge
Different reasons for different property types. Rented property in Tonbridge runs on the 2020 PRS regulations — five years between inspections, plus a fresh report at the start of each new tenancy. The certificate is supplied to tenants and to the local authority on request. Owner-occupied property doesn’t have a statutory cycle. IET guidance is 10 years for domestic, but plenty of homeowners inspect more frequently — usually around major life events like buying, selling, or renovating. Insurance renewals also trigger it, especially on older properties or where there’s been a previous claim.

Standards and what compliance looks like
The technical standard for an EICR is BS 7671:2018+A2:2022 — the 18th Edition of the IET Wiring Regulations with Amendment 2. Any EICR signed off after January 2023 should reference that version. Older reports against earlier amendments are still valid for the cycle they were issued in but should be re-tested to current standards on the next inspection. The format of the report itself follows BS 7671 Appendix 6 — schedule of inspections, schedule of test results, list of observations with codes. Reports formatted to that standard are accepted by every Tonbridge and Malling local authority, every insurer, and every estate agent we’ve worked with.
Fittings and where they go
The visual inspection covers everything accessible without destruction: the consumer unit (cover off, devices and connections inspected), accessories throughout the property (sockets, switches, light fittings, ceiling roses, fan isolators, immersion switches), the meter cupboard, earthing and bonding at the main intake, and any outbuilding distribution boards. Findings are noted with photographs where useful. Common Tonbridge findings: undersized consumer units missing RCD protection on older lighting circuits; mixed-metallic fittings and chrome sockets that show pitting where there’s been arcing; loose backbox screws on wall sockets; cracked switch plates; unprotected cable runs in loft spaces.

Testing schedule and remedials
Testing splits into dead testing (with the circuit isolated) and live testing (with the supply restored). Dead tests cover continuity of protective conductors, insulation resistance between live and earth, polarity, and ring final continuity on socket circuits. Live tests cover earth fault loop impedance, prospective fault current, and RCD operation times. Each circuit’s results are recorded individually on the schedule of test results that accompanies the certificate. For a typical three-bed property in Tonbridge the on-site time is half a day. Larger or older properties with more circuits can take a full day. The brief power-down for dead testing on each circuit is usually a few minutes per circuit — long enough to put kettles and computers off the boil, short enough that nothing in the fridge defrosts.
Why Tonbridge property owners book CJA Electrical
CJA Electrical is based in Rochester and covers EICR work across Tonbridge and Malling from there. Tonbridge sits within the 55-minute working radius — close enough that scheduling is tight, return visits for remedial work are easy, and you’re dealing with someone who knows the local stock. We do mostly residential EICR plus increasingly commercial fixed-wire work as the client base has grown. Qualifications: City & Guilds 2391 (Inspection & Testing), 2382 (18th Edition Wiring Regulations), and 2365 (Diploma in Electrical Installation). Calibrated test equipment. Certificates supplied as PDF inside 48 hours. Remedial work quoted separately so the price is clear and you can plan the budget.
How the work runs
The flow is simple. First contact (phone, email, or WhatsApp) to confirm the property size, circuit count, and rough timing. A quote — fixed price for most Tonbridge domestic EICRs, given on the call. A scheduled inspection visit, typically inside the working week. The written report supplied as a PDF inside 48 hours of testing completing. If anything is unsatisfactory, remedial work is quoted separately. Once remedials are done, the affected circuits are re-tested and a fresh, satisfactory certificate is issued. Most landlord and pre-sale jobs run start-to-finish in a working week; commercial and larger residential might take a fortnight including remedials.
What affects the price
Pricing is transparent: a fixed price for the inspection and report, separate quoting for remedials. The fixed price is set on a brief scoping call about the property — rough age, number of consumer units, circuit count if known, occupancy. Most Tonbridge domestic EICRs are quoted on that call alone. Larger properties — anything with multiple consumer units, significant outbuildings, three-phase commercial supply — get a capped quote after a quick site visit. The cap means you have certainty on the maximum cost going in, even if the on-site time runs slightly longer than expected.
FAQs
How long does an EICR take?
Half a day for a typical Tonbridge three-bed home. Smaller flats can be done in a couple of hours; larger properties with multiple consumer units or extensive outbuildings can take a full day. We give a realistic estimate at quoting stage based on circuit count and access.
Do I need to be present during the inspection?
For owner-occupied property, ideally yes — there’ll be brief power-downs as each circuit is tested, and someone needs to be aware in case sensitive equipment needs warning. For tenanted property, tenant access can be arranged via the letting agent or directly with the tenant; landlord attendance isn’t necessary.
What’s the difference between a Satisfactory and Unsatisfactory report?
A satisfactory report has no C1 (immediate danger) or C2 (potentially dangerous) observations. C3 observations (improvement recommended) on their own don’t fail the report. An unsatisfactory report means C1 or C2 observations are present and the installation needs remedial work to bring it back to compliance.
Can you do remedial work on the same visit?
Sometimes — minor remedials (replacing a damaged socket face, tightening a loose connection, fitting a missing blanking plate) can be done on the inspection visit if time and parts allow. Larger remedial work (consumer unit replacement, recircuiting, additional RCD protection) is quoted separately and scheduled as a follow-up.
Will the inspection damage anything?
No. The tests are non-destructive. Insulation resistance and earth fault loop are low-current measurements that don’t stress the installation. Most of the on-site work is visual inspection plus brief electrical testing on each circuit. The only disruption is the short power-downs during dead testing.
How quickly can I get a report after the inspection?
PDF inside 48 hours of testing completing. We can usually turn it around faster (same evening, next morning) if there’s a deadline — landlord renewal, sale exchange, insurance renewal — and we just need to know the deadline up front.
Related services in Tonbridge
- Landlord EICR in Tonbridge
- Emergency in Tonbridge
- Alarms in Tonbridge
- Emergency Lighting in Tonbridge
- Commercial EICR in Tonbridge
- Outdoor Lighting in Tonbridge
EICR in nearby towns
- EICR in Tunbridge Wells — Tunbridge Wells
- EICR in Sevenoaks — Sevenoaks
- EICR in Maidstone — Maidstone
Frequently asked questions
How long does an EICR take?
Half a day for a typical Tonbridge three-bed home. Smaller flats can be done in a couple of hours; larger properties with multiple consumer units or extensive outbuildings can take a full day. We give a realistic estimate at quoting stage based on circuit count and access.
Do I need to be present during the inspection?
For owner-occupied property, ideally yes — there'll be brief power-downs as each circuit is tested, and someone needs to be aware in case sensitive equipment needs warning. For tenanted property, tenant access can be arranged via the letting agent or directly with the tenant; landlord attendance isn't necessary.
What's the difference between a Satisfactory and Unsatisfactory report?
A satisfactory report has no C1 (immediate danger) or C2 (potentially dangerous) observations. C3 observations (improvement recommended) on their own don't fail the report. An unsatisfactory report means C1 or C2 observations are present and the installation needs remedial work to bring it back to compliance.
Can you do remedial work on the same visit?
Sometimes — minor remedials (replacing a damaged socket face, tightening a loose connection, fitting a missing blanking plate) can be done on the inspection visit if time and parts allow. Larger remedial work (consumer unit replacement, recircuiting, additional RCD protection) is quoted separately and scheduled as a follow-up.
Will the inspection damage anything?
No. The tests are non-destructive. Insulation resistance and earth fault loop are low-current measurements that don't stress the installation. Most of the on-site work is visual inspection plus brief electrical testing on each circuit. The only disruption is the short power-downs during dead testing.
How quickly can I get a report after the inspection?
PDF inside 48 hours of testing completing. We can usually turn it around faster (same evening, next morning) if there's a deadline — landlord renewal, sale exchange, insurance renewal — and we just need to know the deadline up front.
Get a quote
Send a quick message and you'll get a same-day reply during working hours. Skip straight to phone or WhatsApp if you prefer.
Or skip the form: Call 07598 216512 WhatsApp info@cjaelectrical.co.uk