EICR in Sheerness
EICR testing in Sheerness, with same-week appointments across Swale.
Periodic inspection and testing in Sheerness — what most people just call an EICR. The work covers a visual inspection of the consumer unit and accessible accessories, dead and live testing on every circuit, and a written report with each observation coded against BS 7671. Common drivers in Swale: a 5-yearly landlord check, a pre-sale or pre-purchase EICR, an insurer asking for current documentation, or a homeowner whose installation hasn’t been tested in a decade.
What EICR actually is
The EICR has two components: a visual inspection of the installation (consumer unit, accessible accessories, cable routing, earthing and bonding) and an electrical test on every circuit (continuity, insulation resistance, polarity, earth fault loop, RCD operation). What ends up on the report is a formal opinion of whether the installation is satisfactory or unsatisfactory against BS 7671:2018+A2:2022 — the current edition of the Wiring Regulations. Each observation is given a code. C1 is immediate danger and means stop using that part of the installation now. C2 is potentially dangerous and remedial work is needed before a satisfactory report can be issued. C3 is improvement recommended but doesn’t fail the report. FI means more investigation is needed before a code can be given.
When you need EICR in Sheerness
Different reasons for different property types. Rented property in Sheerness runs on the 2020 PRS regulations — five years between inspections, plus a fresh report at the start of each new tenancy. The certificate is supplied to tenants and to the local authority on request. Owner-occupied property doesn’t have a statutory cycle. IET guidance is 10 years for domestic, but plenty of homeowners inspect more frequently — usually around major life events like buying, selling, or renovating. Insurance renewals also trigger it, especially on older properties or where there’s been a previous claim.

Standards and what compliance looks like
BS 7671:2018+A2:2022 is the technical reference behind every EICR. The standard sets out what gets inspected, what gets tested, what tolerances apply to each measurement, and how observations are coded. The 2022 amendment introduced changes around surge protection (now required on most domestic installations), arc fault detection in some circumstances, and updated requirements for outdoor and EV charging circuits. Older installations being inspected today are tested to current standards. That doesn’t mean every pre-2022 installation needs rewiring — observations are coded based on whether the departure from current standards represents an actual safety issue. A consumer unit pre-dating the 2022 amendment that’s otherwise sound is typically a C3 (improvement recommended) rather than a C2 (potentially dangerous).
Fittings and where they go
The visual inspection covers everything accessible without destruction: the consumer unit (cover off, devices and connections inspected), accessories throughout the property (sockets, switches, light fittings, ceiling roses, fan isolators, immersion switches), the meter cupboard, earthing and bonding at the main intake, and any outbuilding distribution boards. Findings are noted with photographs where useful. Common Sheerness findings: undersized consumer units missing RCD protection on older lighting circuits; mixed-metallic fittings and chrome sockets that show pitting where there’s been arcing; loose backbox screws on wall sockets; cracked switch plates; unprotected cable runs in loft spaces.

Testing schedule and remedials
Testing splits into dead testing (with the circuit isolated) and live testing (with the supply restored). Dead tests cover continuity of protective conductors, insulation resistance between live and earth, polarity, and ring final continuity on socket circuits. Live tests cover earth fault loop impedance, prospective fault current, and RCD operation times. Each circuit’s results are recorded individually on the schedule of test results that accompanies the certificate. For a typical three-bed property in Sheerness the on-site time is half a day. Larger or older properties with more circuits can take a full day. The brief power-down for dead testing on each circuit is usually a few minutes per circuit — long enough to put kettles and computers off the boil, short enough that nothing in the fridge defrosts.
Why Sheerness property owners book CJA Electrical
Most of the EICR work that comes through CJA Electrical in Sheerness is repeat business or referrals — landlords on the 5-yearly cycle, agents who’ve used us across multiple portfolios, homeowners coming back at sale or purchase, and word-of-mouth from other tradespeople in the area. Word-of- mouth in a town this size builds the reputation steadily and the work is done by someone with that reputation to protect. The practical benefits: same-day quotes, certificates inside 48 hours, transparent pricing on remedials, and the person on site is the person signing the report. No subcontracting, no portal handovers, no chasing up.
How the work runs
Step one — quick chat about the property: how many bedrooms, rough age of the consumer unit, any known issues, any access constraints (tenanted property, occupied during works, working hours preferences). Most quotes are confirmed on that initial call as a fixed price, with larger or unusual properties going to a brief site visit before the quote firms up. Step two — testing visit. Half a day to a full day on site for most domestic property; longer for larger or multi-installation premises. Brief power-downs during dead testing flagged in advance. Step three — the report. PDF inside 48 hours, formatted to BS 7671 Appendix 6, with the schedule of test results, schedule of inspections, and observations all in the standard format insurers and agents expect to see.
What affects the price
EICR pricing is mostly driven by the size of the installation — circuit count more than floor area. A small flat with a single consumer unit and 6-8 circuits is at one end; a larger detached property with two consumer units, an outbuilding sub-board, and 20+ circuits is at the other. Most Sheerness three-bed homes come in as a fixed price after a brief chat about the property. What’s included: the on-site inspection, the testing, the written report, and certificate delivery as a PDF. Remedial work — if anything is unsatisfactory — is quoted separately so you can shop around if you want and so the inspection price stays clean and predictable.
FAQs
What if my property has more than one consumer unit?
Common in larger Sheerness properties — main board plus a garage or outbuilding sub-board, occasionally a separate board for a flat conversion or annexe. Each board is inspected separately and gets its own schedule of test results. The price reflects the additional testing time; we’ll confirm a fixed all-in number at quoting stage.
Can the report be supplied to my agent or council directly?
Yes — the PDF can go to you, your letting agent, your council, your insurer, or all of the above. Swale Borough Council accepts the standard BS 7671 Appendix 6 format, as do all the major letting agents and managing agents we’ve worked with.
How long does an EICR take?
Half a day for a typical Sheerness three-bed home. Smaller flats can be done in a couple of hours; larger properties with multiple consumer units or extensive outbuildings can take a full day. We give a realistic estimate at quoting stage based on circuit count and access.
Do I need to be present during the inspection?
For owner-occupied property, ideally yes — there’ll be brief power-downs as each circuit is tested, and someone needs to be aware in case sensitive equipment needs warning. For tenanted property, tenant access can be arranged via the letting agent or directly with the tenant; landlord attendance isn’t necessary.
What’s the difference between a Satisfactory and Unsatisfactory report?
A satisfactory report has no C1 (immediate danger) or C2 (potentially dangerous) observations. C3 observations (improvement recommended) on their own don’t fail the report. An unsatisfactory report means C1 or C2 observations are present and the installation needs remedial work to bring it back to compliance.
Can you do remedial work on the same visit?
Sometimes — minor remedials (replacing a damaged socket face, tightening a loose connection, fitting a missing blanking plate) can be done on the inspection visit if time and parts allow. Larger remedial work (consumer unit replacement, recircuiting, additional RCD protection) is quoted separately and scheduled as a follow-up.
Will the inspection damage anything?
No. The tests are non-destructive. Insulation resistance and earth fault loop are low-current measurements that don’t stress the installation. Most of the on-site work is visual inspection plus brief electrical testing on each circuit. The only disruption is the short power-downs during dead testing.
Related services in Sheerness
- Landlord EICR in Sheerness
- Emergency in Sheerness
- Alarms in Sheerness
- Emergency Lighting in Sheerness
- Commercial EICR in Sheerness
- Outdoor Lighting in Sheerness
EICR in nearby towns
- EICR in Minster-on-Sea — Swale
- EICR in Sittingbourne — Swale
- EICR in Faversham — Swale
Frequently asked questions
What if my property has more than one consumer unit?
Common in larger Sheerness properties — main board plus a garage or outbuilding sub-board, occasionally a separate board for a flat conversion or annexe. Each board is inspected separately and gets its own schedule of test results. The price reflects the additional testing time; we'll confirm a fixed all-in number at quoting stage.
Can the report be supplied to my agent or council directly?
Yes — the PDF can go to you, your letting agent, your council, your insurer, or all of the above. Swale Borough Council accepts the standard BS 7671 Appendix 6 format, as do all the major letting agents and managing agents we've worked with.
How long does an EICR take?
Half a day for a typical Sheerness three-bed home. Smaller flats can be done in a couple of hours; larger properties with multiple consumer units or extensive outbuildings can take a full day. We give a realistic estimate at quoting stage based on circuit count and access.
Do I need to be present during the inspection?
For owner-occupied property, ideally yes — there'll be brief power-downs as each circuit is tested, and someone needs to be aware in case sensitive equipment needs warning. For tenanted property, tenant access can be arranged via the letting agent or directly with the tenant; landlord attendance isn't necessary.
What's the difference between a Satisfactory and Unsatisfactory report?
A satisfactory report has no C1 (immediate danger) or C2 (potentially dangerous) observations. C3 observations (improvement recommended) on their own don't fail the report. An unsatisfactory report means C1 or C2 observations are present and the installation needs remedial work to bring it back to compliance.
Can you do remedial work on the same visit?
Sometimes — minor remedials (replacing a damaged socket face, tightening a loose connection, fitting a missing blanking plate) can be done on the inspection visit if time and parts allow. Larger remedial work (consumer unit replacement, recircuiting, additional RCD protection) is quoted separately and scheduled as a follow-up.
Will the inspection damage anything?
No. The tests are non-destructive. Insulation resistance and earth fault loop are low-current measurements that don't stress the installation. Most of the on-site work is visual inspection plus brief electrical testing on each circuit. The only disruption is the short power-downs during dead testing.
Get a quote
Send a quick message and you'll get a same-day reply during working hours. Skip straight to phone or WhatsApp if you prefer.
Or skip the form: Call 07598 216512 WhatsApp info@cjaelectrical.co.uk